100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

ICC California UST Service Technician REAL EXAM ACCURATE QUESTIONS WITH 100% RATED CORRECT ANSWERS EXPERT VERIFIED GET IT A+ 2025 LATEST UPDATED

Beoordeling
-
Verkocht
-
Pagina's
26
Cijfer
A+
Geüpload op
13-04-2025
Geschreven in
2024/2025

ICC California UST Service Technician REAL EXAM ACCURATE QUESTIONS WITH 100% RATED CORRECT ANSWERS EXPERT VERIFIED GET IT A+ 2025 LATEST UPDATED

Instelling
ICC California UST Service Technician
Vak
ICC California UST Service Technician










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
ICC California UST Service Technician
Vak
ICC California UST Service Technician

Documentinformatie

Geüpload op
13 april 2025
Aantal pagina's
26
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

ICC California UST Service Technician
Study online at https://quizlet.com/_b9nkfx

1. UDC was required at time of installation for all systems January 1, 2000
installed after?

2. July 1, 2005, service techs shall possess or work under ICC UST Service Technician
someone who has a current certification indicating he Exam
or she has passed the?

3. ICC cert must be renewed every? 24 months

4. Service techs must possess or be employed by a per- The individual has a tank
son who has the appropriate contractor's license un- testing license
less?

5. Service tech is defined by any individual who? Tests UST monitor-
ing equipment, trou-
ble shoots UST systems,
and/or installs UST moni-
toring equipment.

6. If the manufacturer training no longer exist, the local Approve comparable al-
agency may? ternate training .

7. UST includes? Tank and connected pip-
ing

8. What is considered a UST? A petroleum underground
storage tank.

9. What UST system meets the requirements for sec- Doubled wall tanks
ondary containment?

10. According to title 23; the following piping components Pressured product piping
if installed after July 1, 1987 must have secondary
containment.


, ICC California UST Service Technician
Study online at https://quizlet.com/_b9nkfx


11. What is considered "pipe" on tanks installed after July Pressured product piping
1, 2003? and below ground vapor
recovery.

12. Under dispenser containment (UDC) was required for December 31, 2003
all existing UST systems by

13. What system is for exchanging gas vapors in a storage Stage 1 vapor recovery
tank and product in a fuel delivery truck

14. Which approved method for non-visual monitoring Statistical Inventory Rec-
for existing UST systems. onciliation (SIR)

15. ATG must be capable for detecting a release of? 0.2 gallons per hour

16. What is no longer an approved method for non-visual Manual inventory recon-
monitoring on existing UST systems? ciliation.

17. Automatic line leak detectors installed on under- 3 gallons per hour at 10
ground piping with secondary containment shall be psi
capable of detecting a leak of ?

18. How often should ATG be programmed to test the At least monthly
tank?

19. According to PEI RP 300, a combustible gas can be Detect vapor leaks in a va-
used to? por recovery system.

20. According to PEI RP 300, a written scope of work for Construction plans
vapor recovery installation should include?

21. Positive shut off overfill protection device must stop 95% full
the flow of fuel when the tank is no more then?



, ICC California UST Service Technician
Study online at https://quizlet.com/_b9nkfx

22. According to Executive Order (EO) VR 201-A , what Depended filter seal dam-
could cause a nozzle shut off mechanism or malfunc- age
tion?

23. According to VR 201-A, breakaway reconnection must Logged in GDF log
be?

24. According to PEI RP 300 what is an INCORRECT Sketching a diagram on
method of documenting piping location? the inside cover of vapor
recovery equipment man-
ual

25. According to PEI RP 300 as built drawing or pictures of maintained as long as UST
the underground pipping and other components shall is in service.
be_________.

26. According to EO VR 101-E maintenance records are Name and Designated
required to include what? UST Operator.

27. The Phil-Tite EVR Phase 1 system require that vapor Used with no more than 3
vent pipes at any UST system be p/v valves

28. According to EO VR 2010 after installing a new spout Nozzle dispensing shut off
assembly in the Healy 900 nozzle the following test test
must be conducted?

29. According to Healy EO VR 201-A a vapor recovery Gasoline dispensing facil-
record is to be maintained by? ity operator(GDF)

30. An enhanced leak detection test is required within 1000 feet
how many feet of a public drinking well?

31. What are the components of the Fire Triangle? Fuel, Heat/Ignition
Source, Oxygen

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
ALICIADELLA Oxford University
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
569
Lid sinds
1 jaar
Aantal volgers
2
Documenten
1510
Laatst verkocht
22 uur geleden
Alicia’s Study Vault

Ace your exams with Alicia’s Study Vault! I provide detailed exam elaborations, case studies, summaries, and high-quality study notes to help you succeed effortlessly. Whether you need a quick review or in-depth insights, my materials are well-structured, easy to understand, and exam-focused. Get the best study resources and boost your grades today!

4.9

42 beoordelingen

5
40
4
0
3
1
2
0
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen