100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ICC CALIFORNIA UST SERVICE TECHNICIAN LATEST UPDATED 2025/2026 EXAM REAL EXAM 250+ COMPLETE QUESTIONS AND SURE VERIFIED ANSWERS 100% GRADED AT A+ SCORE SURE GUARANTEED PASS!!

Rating
-
Sold
-
Pages
139
Grade
A+
Uploaded on
04-04-2025
Written in
2024/2025

ICC CALIFORNIA UST SERVICE TECHNICIAN LATEST UPDATED 2025/2026 EXAM REAL EXAM 250+ COMPLETE QUESTIONS AND SURE VERIFIED ANSWERS 100% GRADED AT A+ SCORE SURE GUARANTEED PASS!! Which agency approves a site-specific variance which allows for an alternative method of construction or monitoring: a.) The Regional Water Quality Board b.) The State Water Resources Control Board c.) The Department of Toxic Substance Control d.) The local agency - ANSWER a.) The Regional Water Quality Board CCR Title 23, Sec 2681(a) 2. Which of the following is not a confined space: a.) A really deep turbine sump b.) A space not designed for continuous employee occupancy c.) An area with limited access d.) An area with limited ventilation - ANSWER d.) An area with limited ventilation CCR Title 8, Sec 5157(b) 3. The regulations to enforce compliance of underground storage tank systems in the state are found in? a.) Code of Federal Regulations, 40 CFR Part 281 b.) California Code of Regulations, Title 23, Chapter 16 c.) Code of Federal Regulations, 40 CFR Part 280 d.) California Code of Regulations, Title 23, Chapter 17 - ANSWER b.) California Code of Regulations; Title 23, Chapter 16 4. A secondary containment system which is not an t ofintegral par primary containment shall be designed and constructed according to an engineering specification approved by a third party. The secondary containment system shall contain ______________ of the volume of the largest primary container within it, in the case of multiple primary containers: a.) 100 percent b.) 10 percent c.) 110 percent d.) 150 percent - ANSWER d.) 150 percent CCR Title 23, Sec 2631(e)(1)(B) 5. By definition an "underground storage tank system" includes a.) The tank, all connected piping and dispensers b.) The tank, all connected piping, ancillary equipment and containment system c.) Only the tank d.) Only tanks totally beneath the surface of the ground - ANSWER b.) The tank, all connected piping, ancillary equipment and containment system (H&SC, Sec 25281(z)) 6. The written report submitted to the local agency after an unauthorized release is required to include the following except: a.) Description of actions taken to stop the release b.) Cause of the release c.) Method of disposal of released product d.) Date on which the release was discovered - ANSWER b.) Cause of the release CCR Title 23, Sec 2652(c) 7. An unauthorized release which does not escape from secondary containment only requires a record on the operator's monitoring reports provided: A. It did not increase the hazard of fire B. It did not cause any deterioration of the secondary containment C. It was cleaned up within 8 hours of detection D. All of the above - ANSWER D. All of the above H&SC, Sec 25294 8. The annual monitoring certification may be performed by: A. A person possessing the appropriate contractors licenses B. An individual trained and certified by the manufacturer of the monitoring equipment C. A designated UST operator D. A person who meets the requirements of both a and b - ANS

Show more Read less
Institution
ICC CALIFORNIA UST SERVICE TECHNICIAN
Course
ICC CALIFORNIA UST SERVICE TECHNICIAN











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ICC CALIFORNIA UST SERVICE TECHNICIAN
Course
ICC CALIFORNIA UST SERVICE TECHNICIAN

Document information

Uploaded on
April 4, 2025
Number of pages
139
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ICC CALIFORNIA UST SERVICE TECHNICIAN
LATEST UPDATED 2025/2026 EXAM
REAL EXAM 250+ COMPLETE QUESTIONS
AND SURE VERIFIED ANSWERS 100%
GRADED AT A+ SCORE SURE
GUARANTEED PASS!!

1. Which agency approves a site-specific variance which allows for an
alternative method of construction or monitoring:
a.) The Regional Water Quality Board
b.) The State Water Resources Control Board
c.) The Department of Toxic Substance Control
d.) The local agency - ANSWER ✔ a.) The Regional Water Quality
Board
CCR Title 23, Sec 2681(a)

2. Which of the following is not a confined space:
a.) A really deep turbine sump
b.) A space not designed for continuous employee occupancy
c.) An area with limited access
d.) An area with limited ventilation - ANSWER ✔ d.) An area with
limited ventilation
CCR Title 8, Sec 5157(b)


3. The regulations to enforce compliance of underground storage tank
systems in the state are found in?
a.) Code of Federal Regulations, 40 CFR Part 281
b.) California Code of Regulations, Title 23, Chapter 16

,c.) Code of Federal Regulations, 40 CFR Part 280
d.) California Code of Regulations, Title 23, Chapter 17 - ANSWER ✔
b.) California Code of Regulations; Title 23, Chapter 16



4. A secondary containment system which is not an integral part of
primary containment shall be designed and constructed according to an
engineering specification approved by a third party. The secondary
containment system shall contain ______________ of the volume of the
largest primary container within it, in the case of multiple primary
containers:
a.) 100 percent
b.) 10 percent
c.) 110 percent
d.) 150 percent - ANSWER ✔ d.) 150 percent
CCR Title 23, Sec 2631(e)(1)(B)


5. By definition an "underground storage tank system" includes
a.) The tank, all connected piping and dispensers
b.) The tank, all connected piping, ancillary equipment and containment
system
c.) Only the tank
d.) Only tanks totally beneath the surface of the ground - ANSWER ✔
b.) The tank, all connected piping, ancillary equipment and containment
system

(H&SC, Sec 25281(z))

6. The written report submitted to the local agency after an unauthorized
release is required to include the following except:
a.) Description of actions taken to stop the release
b.) Cause of the release

,c.) Method of disposal of released product
d.) Date on which the release was discovered - ANSWER ✔ b.) Cause
of the release
CCR Title 23, Sec 2652(c)

7. An unauthorized release which does not escape from secondary
containment only requires a record on the operator's monitoring reports
provided:
A. It did not increase the hazard of fire
B. It did not cause any deterioration of the secondary containment
C. It was cleaned up within 8 hours of detection
D. All of the above - ANSWER ✔ D. All of the above
H&SC, Sec 25294

8. The annual monitoring certification may be performed by:
A. A person possessing the appropriate contractors licenses
B. An individual trained and certified by the manufacturer of the
monitoring equipment
C. A designated UST operator
D. A person who meets the requirements of both a and b - ANSWER ✔
D. A person who meets the requirements of both a and b
CCR Title 23, Sec 2715(i)

9. When an automatic tank gauge is utilized for single-walled tank leak
detection, it shall generate a post-test hard copy data report of the
following information, except:
a.) Liquid volume
b.) Fuel depth
c.) Outside air temperature
d.) Time and date of test - ANSWER ✔ c.) Outside air temperature
CCR Title 23, Sec 2643(b)(1)

, 10. If a UST system is utilizing an overfill alarm, the alarm must be
triggered to alert the transfer operator when the tank is no more than
___________ full
a.) 85%
b.) 95%
c.) 90%
d.) 80% - ANSWER ✔ c.) 90%

11. An automatic tank gauge is utilized for leak detection of the
______________.
a.) Tank
b.) Tank and Piping
c.) Piping
d.) Interstitial space - ANSWER ✔ a.) Tank
CCR Title 23, Sec 2643(b)(1)

12. After completion of enhanced leak detection (ELD) test, the ELD
test results must be submitted to the _________________.
a.) The local agency
b.) The SWRCB
c.) Owner of the UST system
d.) To both the SWRCB and the local agency - ANSWER ✔ d.) To both
the SWRCB and the local agency
CCR Title 23, Sec 2644.1(a)(5)

13. A permit to operate a UST system must have all of the following
listed on the permit, EXCEPT:
a.) The state UST identification number(s)
b.) Name of the tank manufacturer and tank capacity
c.) Permit expiration date
d.) Monitoring requirements - ANSWER ✔ b.) Name of the tank
manufacturer and tank capacity
CCR Title 23, Sec 2712(c)

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Exchequer Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
59
Member since
11 months
Number of followers
1
Documents
1440
Last sold
1 week ago
EXEMPLARY SERVICE IN ACADEMIA EXCELLENCY IN ACCADEMIC MATERIALS ie exams, study guides, testbanks ,case, case study etc

Assignments, Case Studies, Research, Essay writing service, Questions and Answers, Discussions etc. for students who want to see results twice as fast. I CAN DO ASSIGNMENTS, EXAMS,ESSAYS AND RESEARCH PROJECTS FOR YOU EVEN AT STRICT DEADLINES. I have done papers of various topics and complexities. I am punctual and always submit work on-deadline. I write engaging and informative content on all subjects. Send me your research papers, case studies, psychology papers, etc, and I’ll do them to the best of my abilities. Writing is my passion when it comes to academic work. I’ve got a good sense of structure and enjoy finding interesting ways to deliver information in any given paper. I love impressing clients with my work, and I am very punctual about deadlines. Send me your assignment and I’ll take it to the next level. I strive for my content to be of the highest quality. Your wishes come first— send me your requirements and I’ll make a piece of work with fresh ideas, consistent structure, and following the academic formatting rules. For every student you refer to me with an order that is completed and paid transparently, I will do one assignment for you, FREE of any fee.

Read more Read less
2.8

8 reviews

5
3
4
0
3
1
2
0
1
4

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions