GENERAL REQUIREMENTS ICC ACTUAL EXAM WITH
VERIFIED QUESTIONS AND CORRECT ANSWERS|
GUARANTEED SUCCESS| ACE YOUR GRADES.
The type and extent of each special inspection shall be located in - (answers)The
statement of special inspection
Who has the legal authority to enforce the special inspection provisions of the
building code - (answers)Building official
Who can hire an approved inspection agency - (answers)Owners agent
Who can perform a structural observation - (answers)Registered design
professional
Who is required to receive the final report - (answers)Building department
All of the following should be performed by the special inspector on the job site
except - (answers)Stop work when non-conforming items are observed
Who is responsible for providing access to the approved plans - (answers)General
contractor
Who shall the special inspector demonstrate competence to - (answers)Building
official
, 2|Page
Who can issue a stop work order - (answers)Building official
What type of inspection is required for post installed adhesive anchors (epoxy)
placed in a horizontal position into an existing 4000 PSI concrete wall -
(answers)Continuous special inspection
Which of the following does not need to be on a daily report containing non-
conforming items - (answers)A proposed solution from the special inspector
Discrepancies should be brought to the Immediate attention of the -
(answers)Contractor
Foundation walls built per table 1807.1.6.2 require what extent of special
inspection - (answers)None at all
Who must a special inspector notify of their presence on a job site -
(answers)Contractor
When must the statement of special inspection be submitted - (answers)For
permit issuance
The special inspector is required to verify all of the following except -
(answers)Design data for concrete mix and approve it
GENERAL REQUIREMENTS ICC ACTUAL EXAM WITH
VERIFIED QUESTIONS AND CORRECT ANSWERS|
GUARANTEED SUCCESS| ACE YOUR GRADES.
The type and extent of each special inspection shall be located in - (answers)The
statement of special inspection
Who has the legal authority to enforce the special inspection provisions of the
building code - (answers)Building official
Who can hire an approved inspection agency - (answers)Owners agent
Who can perform a structural observation - (answers)Registered design
professional
Who is required to receive the final report - (answers)Building department
All of the following should be performed by the special inspector on the job site
except - (answers)Stop work when non-conforming items are observed
Who is responsible for providing access to the approved plans - (answers)General
contractor
Who shall the special inspector demonstrate competence to - (answers)Building
official
, 2|Page
Who can issue a stop work order - (answers)Building official
What type of inspection is required for post installed adhesive anchors (epoxy)
placed in a horizontal position into an existing 4000 PSI concrete wall -
(answers)Continuous special inspection
Which of the following does not need to be on a daily report containing non-
conforming items - (answers)A proposed solution from the special inspector
Discrepancies should be brought to the Immediate attention of the -
(answers)Contractor
Foundation walls built per table 1807.1.6.2 require what extent of special
inspection - (answers)None at all
Who must a special inspector notify of their presence on a job site -
(answers)Contractor
When must the statement of special inspection be submitted - (answers)For
permit issuance
The special inspector is required to verify all of the following except -
(answers)Design data for concrete mix and approve it