ACQ 202 MODULE 2 EXAM QUESTIONS AND ANSWERS ALREADY PASSED The final approval authority for system-related National Environmental Policy Act (NEPA) documentation is the: - Answers Component Acquisition Executive (CAE). Who would certify the interoperability performance of a command and control system used by both the Army and Navy? - Answers Joint Interoperability Test Command (JITC). Barriers to the successful implementation of Integrated Product and Process Development (IPPD) include the following (Select all that apply): - Answers 1. Need for significant cultural change. 2. Contractor uses IPPD / DoD does not 3. Poorly run meetings or reviews. The Navy awards a cost-plus award fee (CPAF) contract for $265 million to design and develop electronic components for a communications system within 18 months. What reports, if any, would the contractor normally need to provide to the Program Management Office regarding their cost, schedule, and technical performance? - Answers The contractor would submit a Contract Performance Report (CPR) formats 1 through 5 and an Integrated Master Schedule (IMS). Which of the following are "Best Practices" that may be appropriate for software intensive programs? (Select all that apply) - Answers Use metrics to manage and monitor risk. Which of the following exceptions to the full funding policy would allow the Government to budget for buying three years worth of engines under one contract in order to save money? - Answers Multiyear Procurement. Joint Interoperability Test Command (JITC) has primary responsibility for Developmental T&E functions throughout DoD. - Answers False. Transitioning to Integrated Product and Process Development (IPPD) will involve application of certain key tenets, such as customer focus, concurrent development, and: - Answers Event-driven scheduling. Which one of the following T&E products is required at Milestone C? - Answers Approved TEMP If a contractor chooses to use their own quality system, they must demonstrate compliance with the established military standard through formal third party certification. . - Answers False. A _______ is an aggregation of program elements that reflects a macro-level force mission or support mission of DOD. - Answers Major Program (MP). Which of the following is recognized as a barrier to the successful implementation of Integrated Product and Process Development (IPPD)? - Answers Lack of commitment from top management In fixed-price contracts: - Answers The government can terminate the contract for default if the contractor is late or his product does not meet specifications. Which one of the following is a duty of the Director, Operational Test, and Evaluation (DOT&E)? - Answers Reviewing and analyzing the results of operational test and evaluation (OT&E) conducted for each major DoD acquisition program. The Test and Evaluation Master Plan (TEMP) links together, and must be consistent with, which of the following related program documents (Select all that apply)? - Answers 1. Systems Threat Assessment (STA) 2. Initial Capabilities Document (ICD)

Mostrar más Leer menos
Institución
ACQ 202
Grado
ACQ 202









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
ACQ 202
Grado
ACQ 202

Información del documento

Subido en
22 de marzo de 2025
Número de páginas
5
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

ACQ 202 MODULE 2 EXAM QUESTIONS AND ANSWERS ALREADY PASSED

The final approval authority for system-related National Environmental Policy Act (NEPA)
documentation is the: - Answers Component Acquisition Executive (CAE).

Who would certify the interoperability performance of a command and control system used by both the
Army and Navy? - Answers Joint Interoperability Test Command (JITC).

Barriers to the successful implementation of Integrated Product and Process Development (IPPD)
include the following (Select all that apply): - Answers 1. Need for significant cultural change.



2. Contractor uses IPPD / DoD does not



3. Poorly run meetings or reviews.

The Navy awards a cost-plus award fee (CPAF) contract for $265 million to design and develop electronic
components for a communications system within 18 months. What reports, if any, would the contractor
normally need to provide to the Program Management Office regarding their cost, schedule, and
technical performance? - Answers The contractor would submit a Contract Performance Report (CPR)
formats 1 through 5 and an Integrated Master Schedule (IMS).

Which of the following are "Best Practices" that may be appropriate for software intensive programs?
(Select all that apply) - Answers Use metrics to manage and monitor risk.

Which of the following exceptions to the full funding policy would allow the Government to budget for
buying three years worth of engines under one contract in order to save money? - Answers Multiyear
Procurement.

Joint Interoperability Test Command (JITC) has primary responsibility for Developmental T&E functions
throughout DoD. - Answers False.

Transitioning to Integrated Product and Process Development (IPPD) will involve application of certain
key tenets, such as customer focus, concurrent development, and: - Answers Event-driven scheduling.

Which one of the following T&E products is required at Milestone C? - Answers Approved TEMP

If a contractor chooses to use their own quality system, they must demonstrate compliance with the
established military standard through formal third party certification. . - Answers False.

A _______ is an aggregation of program elements that reflects a macro-level force mission or support
mission of DOD. - Answers Major Program (MP).

, Which of the following is recognized as a barrier to the successful implementation of Integrated Product
and Process Development (IPPD)? - Answers Lack of commitment from top management

In fixed-price contracts: - Answers The government can terminate the contract for default if the
contractor is late or his product does not meet specifications.

Which one of the following is a duty of the Director, Operational Test, and Evaluation (DOT&E)? -
Answers Reviewing and analyzing the results of operational test and evaluation (OT&E) conducted for
each major DoD acquisition program.

The Test and Evaluation Master Plan (TEMP) links together, and must be consistent with, which of the
following related program documents (Select all that apply)? - Answers 1. Systems Threat Assessment
(STA)



2. Initial Capabilities Document (ICD)



3. Acquisition Program Baseline (APB).

Critical Intelligence Parameters (CIPs) are those key performance thresholds of foreign threat systems,
which, if exceeded, could compromise the mission effectiveness of the U.S. system in

development. Adversary military doctrine, tactics, strategy, and ______________ of systems should be
considered in CIPs. - Answers Expected employment.

The first key step of the Product Support Strategy Process Model includes which of the following? -
Answers Understanding Warfighter requirements in terms of performance.

If the program is on the DOT&E Oversight List, which one of the following test and evaluation (T&E)
products is required before the Full Rate Production Decision Review? - Answers DOT&E report on initial
operational test and evaluation.

Each of the following issues impact test planning and execution activities except one. Select the one that
is NOT a test planning/execution issue. - Answers Limited test reports



interoperability testing requirements

The National Environment Policy Act (NEPA) can affect defense acquisition program managers because: -
Answers NEPA requires environmental impacts to be considered in the decision making process for
acquisition programs.
$10.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TutorJosh Chamberlain College Of Nursing
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
361
Miembro desde
1 año
Número de seguidores
16
Documentos
29611
Última venta
1 semana hace
Tutor Joshua

Here You will find all Documents and Package Deals Offered By Tutor Joshua.

3.6

58 reseñas

5
20
4
15
3
12
2
0
1
11

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes