100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

SAFe POPM 6.0 EXAM 2025| BRAND NEW ACTUAL EXAM WITH 100% VERIFIED QUESTIONS AND CORRECT SOLUTIONS| GUARANTEED VALUE PACK| ACE YOUR GRADES.

Puntuación
-
Vendido
-
Páginas
44
Grado
A+
Subido en
18-03-2025
Escrito en
2024/2025

SAFe POPM 6.0 EXAM 2025| BRAND NEW ACTUAL EXAM WITH 100% VERIFIED QUESTIONS AND CORRECT SOLUTIONS| GUARANTEED VALUE PACK| ACE YOUR GRADES.

Institución
SAFe POPM 6.0
Grado
SAFe POPM 6.0











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
SAFe POPM 6.0
Grado
SAFe POPM 6.0

Información del documento

Subido en
18 de marzo de 2025
Número de páginas
44
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

1|Page



SAFe POPM 6.0 EXAM 2025| BRAND NEW ACTUAL
EXAM WITH 100% VERIFIED QUESTIONS AND
CORRECT SOLUTIONS| GUARANTEED VALUE PACK|
ACE YOUR GRADES.



What is one benefit of constant customer feedback?

A) Fast learning cycles

B) It reduces the need for face-to-face collaboration

C) Teams can better align working days with a customer's schedule

D) It reduces the amount of changes to the Features - (answers)A) Fast learning
cycles



Which statement describes the Scaled Agile Framework?

A) It scales Scrum to multiple Agile Teams

B) It provides guidelines for Project Managers

C) It provides strict guidelines for all daily activities

D) It synchronizes alignment, collaboration, and delivery for large numbers of
teams - (answers)D) It synchronizes alignment, collaboration, and delivery for
large numbers of teams



The Work-in-Process limit at the Analyzing step of the ART Kanban is based on the
overall availability of Product Management, other subject matter experts, and the
capacity of which two other roles? (Choose two.)

A) Lean Agile Center of Excellence

,2|Page


B) Release Train Engineer

C) Business Owners

D) System Architects

E) Agile Portfolio Operations - (answers)C) Business Owners

D) System Architects



Features in ART Backlogs can result from what?

A) Decomposing Enabler Stories

B) Splitting Epics or Capabilities

C) Aggregating stories into Features

D) Refining the Team Backlog - (answers)B) Splitting Epics or Capabilities



Which statement is true about fast feedback?

A) It supports SAFe Lean-Agile Principle #3 - Assume variability, preserve options

B) The shorter the feedback cycle, the higher the utilization

C) It accelerates planning and delivery

D) Smaller batch sizes enable faster feedback loops - (answers)A) It supports SAFe
Lean-Agile Principle #3 - Assume variability, preserve options



Which two types of items are maintained in the Team Backlog? (Choose two.)

A) Business Epics

B) Enabler Stories

,3|Page


C) User Stories

D) PI Objectives

E) Epic Enablers - (answers)B) Enabler Stories

C) User Stories



Product Managers are expected to collaborate in planning the amount of
upcoming Enabler work by establishing what?

A) Team Backlog prioritization

B) Capacity allocation

C) Accurate user story sizing

D) Completed Epic acceptance criteria - (answers)B) Capacity allocation



The team is struggling to agree on the story point sizing of a new user story. The
PO was previously a related domain expert and feels the team is wasting time.
What should she do?

A) Instruct the SM to resize the story

B) Continue to support the team's decision on sizing

C) Make the team aware of her expertise and decide the size for them

D) Suggest the team stop the sizing of the user story and add it to the next
iteration as is - (answers)B) Continue to support the team's decision on sizing



True or False: Epics are estimated in story points rolled up from feature estimates

A) True

, 4|Page


B) False - (answers)A) True



How frequently should the ART Backlog be reviewed?

A) Every week

B) When the Epic owners are defining the Epic Value Statement

C) Continuously

D) Before every PI - (answers)C) Continuously



The first three elements of the Continuous Delivery Pipeline work together to
support delivery of small batches of new functionality. These continuous
elements include Exploration, Integration, and what else?

A) Deployment

B) Automation

C) Execution

D) Compliance - (answers)A) Deployment



Why would Product Owners and Product Managers be key collaborators in the
enterprise?

A) They are key roles in steering and sequencing the Agile Release Train priorities

B) They plan all the key events for the Planning Increment

C) They provide governance and spending practices for the value streams

D) They plan Portfolio strategy horizons for the enterprise - (answers)A) They are
key roles in steering and sequencing the Agile Release Train priorities
Gratis
Accede al documento completo:
Descarga

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
Nelly003

Conoce al vendedor

Seller avatar
Nelly003 Teachme2-tutor
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
254
Miembro desde
1 año
Número de seguidores
2
Documentos
3052
Última venta
4 días hace

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes