2025
FDOT EARTHWORK LEVEL 1 EXAM 2025 WITH GUARANTEED ACCURATE ANSWERS
Basics covered in Level 1 - ACCURATE ANSWERS✔✔ Nuclear
Testing
Speedy Moisture
Report Forms
Earthwork has to do with the roadway in what way? - ACCURATE
ANSWERS✔✔ Earthwork is the excavation and placement of soils and
materials supporting the proposed roadway.
In Earthwork what is a lift? - ACCURATE ANSWERS✔✔ 6" of
compacted depth at full width
, In Earthwork what is a Lot? - ACCURATE ANSWERS✔✔ A lot is 1 lift
at 500 ft or within compacted area. Isolated compaction operations are
separate lots.
Sampling at the roadway is done for - ACCURATE ANSWERS✔✔
Done for base, sub grade, and embankment.
Sampling is determined how - ACCURATE ANSWERS✔✔ generated
with random numbers usually by a Verification Inspector
What is important about sampling at the roadway - ACCURATE
ANSWERS✔✔ Minimum of three representative sample combined.
What is LIMS? - ACCURATE ANSWERS✔✔ Laboratory Info
Management System
The proctor theory is when compaction is achieved how - ACCURATE
ANSWERS✔✔ by inputting energy to expel air and water in the soil
voids
Compaction causes - ACCURATE ANSWERS✔✔ An increase in unit
weight, decrease in compressibility and permeability.