100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

FDOT ASPHALT PAVING LEVEL 2 EXAM NEWEST ACTUAL EXAM COMPLETE 100 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+

Rating
1.0
(1)
Sold
3
Pages
18
Grade
A+
Uploaded on
06-11-2024
Written in
2024/2025

FDOT ASPHALT PAVING LEVEL 2 EXAM NEWEST ACTUAL EXAM COMPLETE 100 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+

Institution
FDOT ASPHALT PAVING
Course
FDOT ASPHALT PAVING










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
FDOT ASPHALT PAVING
Course
FDOT ASPHALT PAVING

Document information

Uploaded on
November 6, 2024
Number of pages
18
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

FDOT ASPHALT PAVING LEVEL 2 EXAM NEWEST
ACTUAL EXAM COMPLETE 100 QUESTIONS AND
CORRECT DETAILED ANSWERS (VERIFIED
ANSWERS) |ALREADY GRADED A+
A quality of Asphalt Mix will be:
A. Constructable
B. Conform to specifications
C. Satisfy the functional requirements
D. All the above
- ans -(D. All the above) - Constructable, conform to specifications, and satisfy the
functional requirements

Which condition will result in more time available for compaction?
A. SP-19 coarse mix during the day
B. FC-9.5 fine mix at night
C. FC-9.5 coarse mix during the day
D. SP-12.5 fine mix with PG76-22
- ans -(A.) SP-19 coarse mix during the day

The fallowing statement is true about trucks used to haul asphalt mix:
A. Truck drivers must be certified to haul asphalt mix
B. Truck beds need to be clean and smooth
C. Hole must be present in both sides of truck bed
D. All the above
E. Both B & C
- ans -(E. Both B & C) - Truck beds need to be clean and smooth and hole must be
present in both sides of the truck bed

When using a vibratory roller, which is generally correct?
A. Keep the roller frequency high and impact spacing between 10-12 impacts per
foot
B. Run low frequency, high amplitude, and 10-12 impacts per foot
C. Vibrate only when the lift of mix is less than 1.25 inches
D. Both A and C
E. Both B and C

,- ans -(B.) Run low frequency, high amplitude, and 10-12 impacts per foot

If the desired spread rate is 165 lbs/sq yds for SP mix, what is the construction
tolerance for the layer thickness? - ans --+ 8.3 lbs/sq yds

On the structural layer prior to the friction course, correct any deficiencies before
placing the friction course.
A. Greater than 3/16"
B. Equal to 3/16"
C. Less than 1/8"
D. Greater than 1/8" - ans -Equal to 3/16"

The standard Lot size for FC-5 is:
A. 500 to 1000 tons
B. A day's production
C. 1000 feet
D. 2000 tons
E. 4000 tons - ans -(D.) 2,000 Tons

Milling can help:
A. Restore curb reveal
B. Remove cracks in the existing pavement
C. Improve the ride
D. Change the cross slope
E. All the above
- ans -(E. All the above) - Restore curb reveal, remove cracks in the existing
pavement, improve the ride, and change the cross slope.

Truck beds need to be coated with release agent:
A. Each time they are loaded
B. Only when they are dirty
C. As needed to prevent the asphalt from sticking
D. All of the above
- ans -(C.) As needed to prevent the asphalt from sticking

, Given: The average sublot density (Gmb) of the roadway cores is 2.223 and the
Gmm for the same sublot is 2.400. The target spread rate was 162 lbs/sq yds.
What is the % of Gmm density for the sublot? - ans -92.6%

(Y/N:) If a Contractor's Quality Control Core Gmb test is 2.225 and the Verification
test on the same ore Gmb test is equal to 2.205, do these two values compare? -
ans -Yes

If roadway density values are decreasing throughout the shift, the possible cause
could be:
A. Not enough trucks on the project
B. Plant production rate cant keep up
C. Roller production rate exceeds paver production rate
D. Paver production rate exceeds roller production rate
E. Both B & C
- ans -(D.) Paver production rate exceeds roller production rate

What is the primary difference between an FC-9.5 and a FC-12.5 mix?
A. FC-9.5 uses ARB-5; FC-12.5 uses ARB-12
B. The top size of the aggregate
C. FC-9.5 is open graded; FC-12.5 is coarse graded
D. FC-9.5 uses granite; FC-12.5 uses oolitic limestone
E. Both A & B
- ans -(B.) - The top size of the aggregate

Emptying the hopper between loads can cause the following:
A. Smooth ride
B. Uniform thickness
C. Proper cross-slope
D. All of the above
E. None of the above
- ans -(E.) None of the above

If the FC-5 friction course aggregate is cracking under the weight of the roller:
A. Is the PLI of the roller between 135 and 200?
B. Is the roller driving on a cool mat?
C. Is the temperature of the mix too high?

Reviews from verified buyers

Showing all reviews
3 weeks ago

1.0

1 reviews

5
0
4
0
3
0
2
0
1
1
Trustworthy reviews on Stuvia

All reviews are made by real Stuvia users after verified purchases.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Essiekarimi walden
View profile
Follow You need to be logged in order to follow users or courses
Sold
16
Member since
1 year
Number of followers
2
Documents
863
Last sold
3 weeks ago
EXAM ESSENTIALS.

Welcome to your one-stop study hub! Where you Ace your exams with real exam past exams and high quality exam packs. Here you will find : >High quality' A graded study materials that have helped countless students succeed. > Comprehensive exam packs by topic eg pharmacology, Anatomy etc. >Instant downloads for quick and easy prep-anytime and anywhere. >High distinction study guides with answers. SAVE TIME, REDUCE ANXIEXTY AND REVISE WITH CONFIDENCE.

Read more Read less
4.0

4 reviews

5
3
4
0
3
0
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions