Which project delivery system is consistent with public sector procurement laws
and the most prevalent delivery system through the 20th century? - ANSWER>
DBB
In DBB the _____ _____ is incompatible with expediting project delivery. -
ANSWER> Linear sequence
in _____, the contractor's input is absent during the design process. - ANSWER>
DBB
What are 3 fundamental concepts that influence the move to integration? -
ANSWER> - Cost-Influence curve
- benefits of fast tracking
- spearin doctrine
What are the 4 phases of the Cost-Influence Curve? - ANSWER> - Planning
- Design
- Construction
- Operations
, P a g e |2
In which project delivery method is the construction team brought on AFTER
design, with open bidding? - ANSWER> - DBB
In the planning phase, Influence has a _____ impact on the project. - ANSWER>
high
In which project delivery method is the construction team brought on EARLY,
facilitating fast-tracking? - ANSWER> DB
Spearin Doctrine: Owner hiring designers provides contractors two specific
implied warranties: Plans and specs are _____; Plans and specs are suitable for
_____ _____. - ANSWER> - accurate
- intended purpose
What are the 5 types of project delivery systems? - ANSWER> - DB
- DBB
- CMAR
- IPD
- Multiple prime contracting
_____ is a linear sequential process. - ANSWER> DBB
In DBB, the A/E is typically selected on _____ and the GC is typically selected on
_____ _____. - ANSWER> - qualifications
- low price
In DBB, design is fully completed _____ input from the GC. - ANSWER>
without
, P a g e |3
In _____, the A/E is acting in the owner's interests. - ANSWER> DBB
Who controls the design team selection in DBB? - ANSWER> The Owner
The _____ project delivery method is well established and understood. -
ANSWER> DBB
The DB process is intended to be highly _____ and fully _____. - ANSWER> -
collaborative
- integrated.
The power of the _____ will deliver projects faster, better, and for optimum cost. -
ANSWER> team
Intense efforts to establish the _____ early in the process can enable big decisions
to be made early and affect project outcomes at lowest cost. - ANSWER> scope
Intense efforts to establish the scope earlier on in the process, drives early team
______ to include key trade _____. - ANSWER> - formation
- subcontractors
Traditionally in _____, the price for entire contract is established at
execution/award. - ANSWER> DB
In _____ DB, the Owner defines the project requirements and scope of prescriptive
work. - ANSWER> traditional