Answers
As part of a major plant renovation project, the industrial engineering department has been asked to balance a revised assembly
- Course
- Institution
An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total time for all tasks is 18 minutes. The line will operate for 450 minutes per day. a. What are the minimum and maximum cycle times? (Round your answers to 1 decimal place.) Minimum cycle time mi...
[Show more]