100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

LSU CM 4100 Construction Scheduling and Cost Control Quiz 1 scored 100 out of Louisiana State University

Rating
-
Sold
1
Pages
10
Uploaded on
14-06-2024
Written in
2023/2024

LSU CM 4100 Construction Scheduling and Cost Control Quiz 1 scored 100 out of Louisiana State University

Institution
CM 4100 Construction Scheduling And Cost Control
Course
CM 4100 Construction Scheduling and Cost Control









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CM 4100 Construction Scheduling and Cost Control
Course
CM 4100 Construction Scheduling and Cost Control

Document information

Uploaded on
June 14, 2024
Number of pages
10
Written in
2023/2024
Type
Exam (elaborations)
Contains
Unknown

Subjects

Content preview

Feedback
Your answer is correct.
The correct answer is:
a.Scheduling determines when to do, and planning determines what to do, how to do and by whom.LSU CM 4100 Construction Scheduling
and Cost Control Quiz 1 scored 100 out
of 100 2024-2025 Louisiana State
University
Question 1
Correct
1.00 points out of 1.00
Question textFlag question
A significant difference between "planning” and "scheduling” is,
Select one:
a.Scheduling determines what is going to be done, and planning determines how to do.
a.Scheduling determines how to do, and planning determines what to do.
a.Scheduling determines when to do, and planning determines what to do, how to do and by whom.
Correct
a.Scheduling determines how to do, and planning determines by whom. Feedback
Your answer is correct.
The correct answers are: Bar charts often directly show material consumption
of each activity., Bar charts can show the relationships of each activity.
Question 2
Correct
1.00 points out of 1.00
Question textFlag question
What is not true about bar charts?
Select one:
Bar charts use a time-scaled presentation.
Bar charts often directly show material consumption of each activity. Bar charts can show the relationships of each activity.
Bar charts cannot show the actual status of a project.
Question 3
Correct
1.00 points out of 1.00
Question textFlag question
What is not true about an activity?
Select one:
An activity usually takes time.
An activity may consume resources.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
smartzone Liberty University
View profile
Follow You need to be logged in order to follow users or courses
Sold
3198
Member since
5 year
Number of followers
2291
Documents
14406
Last sold
2 days ago
AMAIZING EDUCATION WORLD

GET ALL KIND OF EXAMS ON THIS PAGE ,COMPLETE TEST BANKS,SUMMARIES,STUDY GUIDES,PROJECT PAPERS,ASSIGNMENTS,CASE STUDIES, YOU CAN ALSO COMMUNICATE WITH THE SELLER FOR ANY PRE-ORDER,ORDER AND ETC.

3.7

584 reviews

5
260
4
93
3
103
2
29
1
99

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions