Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien 4.2 TrustPilot
logo-home
Examen

CSI CDT Exam Study Guide (questions and answers) 100% solved

Note
-
Vendu
-
Pages
15
Grade
A+
Publié le
06-05-2024
Écrit en
2023/2024

CSI CDT Exam Study Guide (questions and answers) 100% solved Owner - CORRECT ANSWER-Principle stakeholder - initiates project, assumes risk, provides funding AHJ - Authorities Having Jurisdiction - CORRECT ANSWER-Protect public health, safety and welfare Design Team - CORRECT ANSWER-Address planning issues, determine design program, identify codes and regulations, produce procurement and construction documents, administer construction contract, *provide QA/QC procedures* Contractor Team - CORRECT ANSWER-Entity that constructs a facility. Uses management abilities to gather labor forces, subs, and material/product/equipment suppliers Supplier Team - CORRECT ANSWER-Furnishes the materials and products for the facility to be constructed. Fabricator, Distributor, Manufacturer, Supplier. Facility Life Cycle - CORRECT ANSWER-The life cycle of a facility, from concept through construction to use and eventual deconstruction. Project Conception Project Delivery Design Construction Documents Procurement (Bidding/Negotiating/Purchasing) Construction Facility Management Project Conception - CORRECT ANSWER-Transforms the needs of owner into clear concept on which project can be designed. Feasibility Study, Programming, Site Selection, Budgeting. Project Delivery - CORRECT ANSWER-Determine delivery method to be used. Factors - qualifications, experience, capacity, project extent, time requirements. Design - CORRECT ANSWER-Two Phases: schematic design and design development. Deliverables include graphic and written design documents and estimates of project cost. Schematic Design - CORRECT ANSWER-Overall relationships and functions. Site plan and area, general size/shape/massing of elements, elevations and exteriors established, conceptual design criteria identified. Deliverables - schematic drawings, probable cost, preliminary schedules Design Development - CORRECT ANSWER-Technical issues of constructibility and integration of systems and components. Deliverables - Tech information, outline specifications, updated schedule, updated cost estimate. Construction Documents - CORRECT ANSWER-Defined as the written and graphic documents prepared or assembled by the A/E for communicating the project design for construction and administering the construction contract. Construction documents include two major types of documents: Procurement documents and Contract documents. Procurement (Bidding/Negotiating/Purchasing) - CORRECT ANSWER-Acceptance of the contractor's bid or negotiated sum and other conditions will result in award of a contract and commencement of work. Construction - CORRECT ANSWER-Responsibilities: Contractor - perform work, project coordination, comply with project documents. A/E - construction admin, evaluation services, certify application for payment, final inspection of work. Owner - provide information, process payments, approve contract modifications, accept project upon completion. Facility Management - CORRECT ANSWER-During occupancy, owners & facility managers maintain and evaluate the performance of the project and determine suitability for continuing use. OmniClass - CORRECT ANSWER-A multi-table informational framework for organizing information used by the architectural, engineering, and construction industry. UniFormat - CORRECT ANSWER-Uniform classification system for organizing preliminary construction information into a standard order or sequence on the basis of systems or assemblies. Particularly useful in conceptual design. Element Identification. MasterFormat - CORRECT ANSWER-Arranges related construction practices, logical groupings of work results, into a series of divisions. 50 division format. Used for Specifications, data organization, and cost classification. MasterFormat Groups - CORRECT ANSWER-00 Procurement and Contracting Requirement Group Specifications Group - General Requirements 01 - Facility Construction Subgroup (concrete) - Facility Services (plumbing/HVAC) - Site and Infrastructure (Earthwork) - Process Equipment (WW equipment

Montrer plus Lire moins
Établissement
CDT
Cours
CDT









Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
CDT
Cours
CDT

Infos sur le Document

Publié le
6 mai 2024
Nombre de pages
15
Écrit en
2023/2024
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

CSI CDT Exam Study Guide (questions and answers) 100% solved Owner - CORRECT ANSWER -Principle stakeholder - initiates project, assumes risk, provides funding AHJ - Authorities Having Jurisdiction - CORRECT ANSWER -Protect public health, safety and welfare Design Team - CORRECT ANSWER -Address planning issues, determine design program, identify codes and regulations, produce procurement and construction documents, administer construction contract, *provide QA/QC procedures* Contractor Team - CORRECT ANSWER -Entity that constructs a facility. Uses management abilities to gather labor forces, subs, and material/product/equipment suppliers Supplier Team - CORRECT ANSWER -Furnishes the materials and products for the facility to be constructed. Fabricator, Distributor, Manufacturer, Supplier. Facility Life Cycle - CORRECT ANSWER -The life cycle of a facility, from concept through construction to use and eventual deconstruction. Project Conception Project Delivery Design Construction Documents Procurement (Bidding/Negotiating/Purchasing) Construction Facility Management Project Conception - CORRECT ANSWER -Transforms the needs of owner into clear concept on which project can be designed. Feasibility Study, Programming, Site Selection, Budgeting. Project Delivery - CORRECT ANSWER -Determine delivery method to be used. Factors - qualifications, experience, capacity, project extent, time requirements. Design - CORRECT ANSWER -Two Phases: schematic design and design development. Deliverables include graphic and written design documents and estimates of project cost. Schematic Design - CORRECT ANSWER -Overall relationships and functions. Site plan and area, general size/shape/massing of elements, elevations and exteriors established, conceptual design criteria identified. Deliverables - schematic drawings, probable cost, preliminary schedules Design Development - CORRECT ANSWER -Technical issues of constructibility and integration of systems and components. Deliverables - Tech information, outline specifications, updated schedule, updated cost estimate. Construction Documents - CORRECT ANSWER -Defined as the written and graphic documents prepared or assembled by the A/E for communicating the project design for construction and administering the construction contract. Construction documents include two majo r types of documents: Procurement documents and Contract documents. Procurement (Bidding/Negotiating/Purchasing) - CORRECT ANSWER -Acceptance of the contractor's bid or negotiated sum and other conditions will result in award of a contract and commencement of work. Construction - CORRECT ANSWER -Responsibilities: Contractor - perform work, project coordination, comply with project documents. A/E - construction admin, evaluation services, certify application for payment, final inspection of work. Owner - provide information, process payments, approve contract modifications, accept project upon completion. Facility Management - CORRECT ANSWER -During occupancy, owners & facility managers maintain and evaluate the performance of the project and determine suitability for continuing use. OmniClass - CORRECT ANSWER -A multi -table informational framework for organizing information used by the architectural, engineering, and construction industry. UniFormat - CORRECT ANSWER -Uniform classification system for organizing preliminary construction information into a standard order or sequence on the basis of systems or assemblies. Particularly useful in conceptual design. Element Identification. MasterFormat - CORRECT ANSWER -Arranges related construction practices, logical groupings of work results, into a series of divisions. 50 division format. Used for Specifications, data organization, and cost classification. MasterFormat Groups - CORRECT ANSWER -00 Procurement and Contracting Requirement Group Specifications Group

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
StudyCenter1 Teachme2-tutor
Voir profil
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
221
Membre depuis
2 année
Nombre de followers
91
Documents
3852
Dernière vente
1 mois de cela
Nursing school is hard! Im here to simply the information and make it easier!

My mission is to be your LIGHT in the dark. If you"re worried or having trouble in nursing school, I really want my notes to be your guide! I know they have helped countless others get through and thats all i want for YOU! Stay with me and you will find everything you need to study and pass any tests,quizzes abd exams!

4.3

27 revues

5
18
4
4
3
3
2
0
1
2

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions