Vivint S.H.P Final Test Q&A TOP-RATED
When programming a DW21, which loop number is used - 1 When educating the customer on custom rules, which of the following rules can work for any system - Arm or disarm the system everyday at a certain time True or False: You are permitted to program the garage door controller tilt sensor as a wireless zone for security monitoring - True What is the first step of optimizing network reliability on a new install? - Identify potential panel and device locations with the customer True or False: in order to complete a work order in TechGenie, follow the workflow on the left hand side of the job execution screen to ensure each tab is checked off. - True At which frequency do Z-Wave devices communicate? - 908 MHz Which step should be taken in order to avoid causing home damage ? - All of the above When installing multiple cameras, which should you install first - Doorbell camera pro When installing a vivint thermostat, what is the very first step you must take? - Test the existing thermostat/HVAC system What is the power requirement for vivint thermostat - 24V AC When installing a DW21, what size bit should you use to drill the hole for the sensor? - 3/4 " Can the panel duress code be changed? - Yes, you can show the customer how to change it, however, you are NOT allowed to do if for them What are the functions of PAD1 - All of the above Select all that apply: Which devices can function as Z-Wave repeaters and extend the range of the network - Smart Lock Garage door controller Element thermostat (with C-Wire) Lamp module Z-Wave repeater
Written for
- Institution
- Vivint S.H.P
- Course
- Vivint S.H.P
Document information
- Uploaded on
- April 4, 2024
- Number of pages
- 7
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- vivint shp final test
-
vivint shp final test qa top rated
Also available in package deal