100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ACI Grade 1 Field Testing Certification Practice Test NEWEST 2026/2027 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!!

Rating
-
Sold
-
Pages
7
Grade
A+
Uploaded on
11-03-2024
Written in
2023/2024

ACI Grade 1 Field Testing Certification Practice Test NEWEST 2026/2027 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!!

Institution
Field Tech
Course
Field tech









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Field tech
Course
Field tech

Document information

Uploaded on
March 11, 2024
Number of pages
7
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • field tech

Content preview

ACI Grade 1 Field Testing Certification
Practice Test - Irving




For concrete with aggregates less than 3 inches, the thermometer must remain in the fresh
concrete sample a minimum of 5 minutes or until the temperature reading stabilizes. (T or F)
- ANSFalse (2-5 minutes)

The temperature measuring device must be accurate to within 0.1 degree. (T or F) - ANS

The temperature measuring device shall have a capacity of measuring temperature of
freshly mixed concrete throughout a range of _____ to _____ degree F ( ______ to ______
degree C) - ANS30 to 120 degree F ( 0 to 50 degree C)

A composite sample is not needed if only the temperature test is being run. (T or F) -
ANSTrue

The temperature of fresh concrete in a placement must be measured by inserting a
thermometer into the top six inches of concrete. (T or F) - ANSFalse (3 in.)

The temperature of the concrete is recorded to the nearest ______ degree F (______
degree C) - ANS1 degree F (0.5 degree C)

ASTM C1064 states the container used to measure temperature of concrete must be large
enough to provide at least 5 inches of concrete around the sensor. (T or F) - ANS

Calibrate the temperature measuring device at least __________, or whenever there is a
question of accuracy. - ANSAnnually

After the thermometer is placed in the concrete: - ANSGently press concrete around the
thermometer

According to ASTM C1064, what is one reason to take the temperature of concrete? -
ANSVerify conformance

It is allowable to remove the temperature measuring devices from the freshly mixed concrete
to read the temperature if you cannot see the reading. (T or F) - ANSFalse

The maximum allowable time between obtaining the first and last portions of the composite
sample may not exceed 5 minutes. (T or F) - ANSFalse

Start molding specimens for strength tests within 30 minutes after fabricating the composite
sample. (T or F) - ANSFalse (15 mins)

, The composite concrete sample must be protected from sun, wind, contamination and rapid
evaporation. (T or F) - ANSFalse (Contamination and rapid evaporation)

If the concrete contains aggregates larger than those that are appropriate for a size of mold
or equipment used, the sample should be wet-sieved before making the test. (T or F) -
ANSFalse (wet screened)

The composite sample not be remixed before beginning any tests. (T or F) - ANSFalse

Sampling should normally be performed, as the concrete is discharged from the mixer. (T or
F) - ANSTrue

ASTM Method C172 includes the sampling from stationary mixers, paving mixers, truck
mixers, agitators, and non-agitating equipment. (T or F) - ANSTrue

After sampling is completed, start the tests for slump and air content within: - ANSNone of
the above (5 mins)

In any case, do not obtain samples until: - ANSAll the water and admixtures have been
added to the concrete

No samples shall be taken before ______ or after ______ of the batch has been discharged.
- ANS

When strength tests are to be made, the minimum size of the composite sample shall be: -
ANS1 cubic foot

Sample the concrete from the chute of a truck mixer by: - ANS

Fresh concrete to be tested at the job site should be sampled from: - ANSTwo or more
regularly spaced intervals during discharge of the middle portion of the batch

The elapsed time between obtaining the first and final portions of the composite sample,
according to ASTM C172, shall not exceed: - ANSNone of the above

The sides of the slump cone should be tapped with the mallet to consolidate the concrete in
the mold. (T or F) - ANSFalse

For the slump test, when Rodding the second layer and the top layer, the tamping rod should
just penetrate into the underlying layer. (T or F) - ANSTrue

According to ASTM C143, it is permissible to use a mold, which clamps to a non-absorbent
base. (T or F) - ANSTrue

When filling the final layer of the slump cone, never heap the concrete above the top of the
mold. (T or F) - ANSFalse

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AllLegit Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
42
Member since
2 year
Number of followers
15
Documents
1100
Last sold
2 months ago

TIGHT DEADLINE? I CAN HELP Many students don't have the time to work on their academic papers due to balancing with other responsibilities, for example, part-time work. I can relate. kindly don't hesitate to contact me, my study guides, notes and exams or test banks, are 100% graded QUALITY DOCUMENTS FOR BEST RESULTS. In my page you will find latest Exams ,Assignments, Test Banks, Exam Elaboration, test with Questions and Answers, Discussions, Case Studies, package deals, etc. I upload quality. Instant delivery.

Read more Read less
3.6

9 reviews

5
3
4
1
3
4
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions