100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS AND ANSWERS VERIFIED ANSWERS WITH RATIONALES | UPDATED 2024 | GRADED A |

Rating
-
Sold
-
Pages
23
Grade
A+
Uploaded on
05-01-2024
Written in
2023/2024

IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS AND ANSWERS VERIFIED ANSWERS WITH RATIONALES | UPDATED 2024 | GRADED A | IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS AND ANSWERS VERIFIED ANSWERS WITH RATIONALES | UPDATED 2024 | GRADED A | IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS AND ANSWERS VERIFIED ANSWERS WITH RATIONALES | UPDATED 2024 | GRADED A |

Show more Read less
Institution
Course










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Course

Document information

Uploaded on
January 5, 2024
Number of pages
23
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

IFMA FMP PROJECT MANAGEMENT EXAM QUESTIONS
AND ANSWERS VERIFIED ANSWERS WITH RATIONALES |
UPDATED 2024 | GRADED A |


If an organization has narrowed the list of contractors submitting proposals but is
still having trouble deciding between them, what could help? - CORRECT
ANSWER The correct answer is: Bidder presentations

Which statement is true of the Execute, Monitor and Control phases of the project
model? - CORRECT ANSWER The correct answer is: These phases are often
concurrently or iteratively performed.

When project managers determine the level of data to collect for monitoring and
controlling project work, what do they not need to verify? - CORRECT
ANSWER The correct answer is: Project work delays due to data collection are
scheduled.

What do project managers submit when they suggest revising the project
management plan to make it feasible given the current situation? - CORRECT
ANSWER The correct answer is: change order.

What is developed to review a final deliverable from an entire system
perspective? - CORRECT ANSWER The correct answer is: Checklist reviews

Which statement is true about the documentation for project closure? -
CORRECT ANSWER The correct answer is: Documentation may include
operations and maintenance manuals.

A project manager wants to minimize risk and provide some independent checks and
balances on contractor work. Which contract model should the organization use? -
CORRECT ANSWER Construction management Your answer is correct.

Construction management is the best choice because it uses an independent
consultant to supervise separate contracts with design firms and construction firms,
which allows for some independent review. (Reference: 3-2-10)

According to the critical path method (CPM) of scheduling, what is the critical
path for any project? - CORRECT ANSWER the longest set of sequential tasks
in the project. Your answer is correct.

The critical path is the longest set of sequential tasks in a project and indicates the

,shortest possible project duration. The critical path is determined using forward
pass scheduling followed by backward pass scheduling.(Reference: 3-2-3)

, Why does a budget need to be closely integrated with the project schedule? -
CORRECT ANSWER costs are allocated to the period in which they occur. Your
answer is correct.

Development of the budget requires close integration with the project schedule
because costs are allocated to the period in which the costs are incurred. Similarly,
budget constraints can require changes to the project schedule such as completing
a task more quickly to minimize financing costs. Budgets are produced after
schedules. Estimates for costs are made during planning rather than waiting until
later.(Reference: 3-2-5)

Which scheduling methods are for activities NOT concurrently performed? -
CORRECT ANSWER Traditional waterfall model scheduling Your answer is
correct.

In forward pass, backward pass, and critical pass scheduling, as many activities
as possible are concurrently performed, constrained by resource availability and
predecessors. The traditional waterfall model does not include these time-saving
processes, and therefore it is rarely used for project scheduling.(Reference: 3-2-3)

Which statement is true about the process steps used to build a project schedule? -
CORRECT ANSWER Failure to agree on a duration estimate may indicate a need
for further task division. Your answer is correct.

Failure to come to agreement on an estimate may indicate the task needs to be
further broken down. Dependencies are part of sequencing. Knowing the skill
levels of personnel affects the length of time required for a task, so determining
this is necessary. Sequencing is not performed during work breakdown structure
creation. (Reference: 3-2-3)

Which statement is true of communications management for an office relocation? -
CORRECT ANSWER Post-relocation orientation brochures can help employees find
their way around.
Your answer is correct.
Which attribute most accurately describes a project? - CORRECT ANSWER The
correct answer is: Projects are finite.

What is an example of how project managers apply sound management
techniques? - CORRECT ANSWER The correct answer is: they break down a
task further if it remains at the same percent completion despite reported progress.

Which is an advantage of using a standardized project management model? -
CORRECT ANSWER The correct answer is: The model is a framework that
$26.26
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
DrMedinaReiss Walden University
Follow You need to be logged in order to follow users or courses
Sold
153
Member since
2 year
Number of followers
85
Documents
2178
Last sold
4 weeks ago
Perfect Expert Scores

Welcome to my all inclusive store. Get all quality study materials at a cost-effective price. Hello! I'm Prof Eric, and I specialize in a diverse range of subjects including Health Care, Nursing, History, Mathematics, Psychology, and Biology. With a commitment to academic excellence, my work includes meticulously updated exam solutions and study materials designed to help you succeed. Why Choose My Documents: 1.Expertise Across Disciplines: Whether you need help with complex biology concepts, nursing fundamentals, historical analysis, mathematical problems, psychological theories, or healthcare insights, I've got you covered. 2.Updated Exam Solutions: My materials are regularly refreshed to ensure you have the most current and relevant information for your exams. 3.Detailed and Clear: Each document is crafted with precision to provide clarity and ease of understanding, making your study sessions more productive. Welcome to my all inclusive store.Get all quality study materials at a cost-effective price EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A. I ensure scholarly standards in my documents and that's why i'm one of the BEST GOLD RATED TUTORS in Stuvia. I assure a GOOD GRADE if you will use my work.

Read more Read less
4.6

316 reviews

5
223
4
65
3
20
2
5
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions