100% Accurate. Verified.
What are the four teams that comprise the overall Project Team? - ✔✔-Owner, Design, Installation, and
Management
Who would belong to the Design team? - ✔✔-Anyone with Consultant in their title except the moving
consultant
Which groups make up the Management Team? - ✔✔-Developer, Construction Manager, and Building
Management Agency
The End-User, Facility Manager and Building Committee comprise which team within the Project Team?
- ✔✔-Owner
Which group represent the generic roles that are important to the Project process? - ✔✔-Project
Managers, Designers and Installers
Which project characteristics must be considered in order to determine which method is best suited for
a particular project? - ✔✔-Schedule, Size, Type, Complexity, and Procurement Requirements
What is an important aspect of funding that has a direct impact on the project process and
design/installation? - ✔✔-Technical Support Funding
Whether a construction project is large or small, which milestones must be achieved in a typical
schedule? - ✔✔-Programming, Building Design, AV Bid, and Move-In
What type of project is a typical Consultant-Led Design-Bid-Build contract structure good for? - ✔✔-Long
term projects with extended project cycles
,What is the risk in using an OFE/Integrator Installed contract structure? - ✔✔-System and infrastructure
design and facility functionality may suffer
What are some of the important project scope and size considerations in selecting an AV provider? -
✔✔-Financial Stability, Current Workload, and Company Credentials
What type of document typically includes Project Size Requirements, Corporate Profile, Team Personnel,
and Warranty Response Time? - ✔✔-RFQ
a significant difference between the Two-Envelope Bid
Method and the Qualifications- Based Selection Method? - ✔✔-Negotiate with the highest ranking firm
to finalize the contract
What is one of the disadvantages of contracting the AV integrator to the electrical
subcontractor? - ✔✔-More layers of responsibility and communication
When conducting a complete project bid process, what milestone follows the issuing of the RFP? - ✔✔-
Pre-Bid Meeting
Under what circumstances would you likely use an A305-1986 form? - ✔✔-Scoring responses to an RFQ
What is the ideal way to contract an AV integrator? - ✔✔-Directly to the Owner
The process of identifying the activities that end-users need to perform, and developing the functional
descriptions of your systems is referred to as:? - ✔✔-Needs Analysis
What is the main task of the third Step of the Program Phase of a Project? - ✔✔-Conducting program
meetings
What should be included in the written Program Report? - ✔✔-...A conceptual and functional system
description
, The more accurate means to estimate dimensions of a commercial space during a site inspection would
be to? - ✔✔-Count Ceiling Tiles in a drop tile instalation
A client requires a new boardroom. The sales person and engineer are sent to the premises to measure
the facility and talk to the client. At this stage they should be performing a _ - ✔✔-Needs Analysis
Sightlines for audience viewing in a given presentation space can be improved by: - ✔✔-Providing a
sloped, or stepped, seating arrangement
After presenting a proposal, what is the correct plan of action for following up with the client? - ✔✔-
Regularly, until a decision is made
AV professionals determine the end user's needs by examining three things: the required applications,
the tasks, and the: - ✔✔-Functions to support the applications
When working with a client to design an AV solution for a new conference center, the client requests a
detailed budget for the equipment and installation. What phase is the project in? - ✔✔-Design phase
The HDTV aspect ratio is equal to which of the following? - ✔✔-1.78:1
Please select the appropriate resolution for SXGA. - ✔✔-1280 x 1024
The Brightness control adjusts which level? - ✔✔-Black Level
For what purpose would the AV technician designate a loopback internet protocol address in the
127.0.0.1 to 127.255.255.254 range in a network configuration? - ✔✔-To test the local device to see if
TCP/IP is working on your system
It is important to consider Polar Patterns when____ - ✔✔-Selecting Microphones for use at live events