CTS Exam Prep Questions and answers, 100% Accurate. Verified. What are the four teams that comprise the overall Project Team? - -Owner, Design, Installation, and Management Who would belong to the Design team? - -Anyone with Consultant in their title except the moving consultant Which groups make up the Management Team? - -Developer, Construction Manager, and Building Management Agency The End-User, Facility Manager and Building Committee comprise which team within the Project Team? - -Owner Which group represent the generic roles that are important to the Project process? - -Project Managers, Designers and Installers Which project characteristics must be considered in order to determine which method is best suited for a particular project? - -Schedule, Size, Type, Complexity, and Procurement Requirements What is an important aspect of funding that has a direct impact on the project process and design/installation? - -Technical Support Funding Whether a construction project is large or small, which milestones must be achieved in a typical schedule? - -Programming, Building Design, AV Bid, and Move-In What type of project is a typical Consultant-Led Design-Bid-Build contract structure good for? - -Long term projects with extended project cycles What is the risk in using an OFE/Integrator Installed contract structure? - -System and infrastructure design and facility functionality may suffer What are some of the important project scope and size considerations in selecting an AV provider? - -Financial Stability, Current Workload, and Company Credentials What type of document typically includes Project Size Requirements, Corporate Profile, Team Personnel, and Warranty Response Time? - -RFQ a significant difference between the Two-Envelope Bid Method and the Qualifications- Based Selection Method? - -Negotiate with the highest ranking firm to finalize the contract What is one of the disadvantages of contracting the AV integrator to the electrical subcontractor? - -More layers of responsibility and communication When conducting a complete project bid process, what milestone follows the issuing of the RFP? - -Pre-Bid Meeting Under what circumstances would you likely use an A305-1986 form? - -Scoring responses to an RFQ What is the ideal way to contract an AV integrator? - -Directly to the Owner The process of identifying the activities that end-users need to perform, and developing the functional descriptions of your systems is referred to as:? - -Needs Analysis What is the main task of the third Step of the Program Phase of a Project? - -Conducting program meetings What should be included in

Mehr anzeigen Weniger lesen
Hochschule
Kurs










Ups! Dein Dokument kann gerade nicht geladen werden. Versuch es erneut oder kontaktiere den Support.

Schule, Studium & Fach

Hochschule
Studium
Kurs

Dokument Information

Hochgeladen auf
12. august 2023
Anzahl der Seiten
26
geschrieben in
2023/2024
Typ
Prüfung
Enthält
Fragen & Antworten

Themen

Inhaltsvorschau

CTS Exam Prep Questions and answers,
100% Accurate. Verified.

What are the four teams that comprise the overall Project Team? - ✔✔-Owner, Design, Installation, and
Management



Who would belong to the Design team? - ✔✔-Anyone with Consultant in their title except the moving
consultant



Which groups make up the Management Team? - ✔✔-Developer, Construction Manager, and Building
Management Agency



The End-User, Facility Manager and Building Committee comprise which team within the Project Team?
- ✔✔-Owner



Which group represent the generic roles that are important to the Project process? - ✔✔-Project
Managers, Designers and Installers



Which project characteristics must be considered in order to determine which method is best suited for
a particular project? - ✔✔-Schedule, Size, Type, Complexity, and Procurement Requirements



What is an important aspect of funding that has a direct impact on the project process and
design/installation? - ✔✔-Technical Support Funding



Whether a construction project is large or small, which milestones must be achieved in a typical
schedule? - ✔✔-Programming, Building Design, AV Bid, and Move-In



What type of project is a typical Consultant-Led Design-Bid-Build contract structure good for? - ✔✔-Long
term projects with extended project cycles

,What is the risk in using an OFE/Integrator Installed contract structure? - ✔✔-System and infrastructure
design and facility functionality may suffer



What are some of the important project scope and size considerations in selecting an AV provider? -
✔✔-Financial Stability, Current Workload, and Company Credentials



What type of document typically includes Project Size Requirements, Corporate Profile, Team Personnel,
and Warranty Response Time? - ✔✔-RFQ



a significant difference between the Two-Envelope Bid

Method and the Qualifications- Based Selection Method? - ✔✔-Negotiate with the highest ranking firm
to finalize the contract



What is one of the disadvantages of contracting the AV integrator to the electrical

subcontractor? - ✔✔-More layers of responsibility and communication



When conducting a complete project bid process, what milestone follows the issuing of the RFP? - ✔✔-
Pre-Bid Meeting



Under what circumstances would you likely use an A305-1986 form? - ✔✔-Scoring responses to an RFQ



What is the ideal way to contract an AV integrator? - ✔✔-Directly to the Owner



The process of identifying the activities that end-users need to perform, and developing the functional
descriptions of your systems is referred to as:? - ✔✔-Needs Analysis



What is the main task of the third Step of the Program Phase of a Project? - ✔✔-Conducting program
meetings



What should be included in the written Program Report? - ✔✔-...A conceptual and functional system
description

, The more accurate means to estimate dimensions of a commercial space during a site inspection would
be to? - ✔✔-Count Ceiling Tiles in a drop tile instalation



A client requires a new boardroom. The sales person and engineer are sent to the premises to measure
the facility and talk to the client. At this stage they should be performing a _ - ✔✔-Needs Analysis



Sightlines for audience viewing in a given presentation space can be improved by: - ✔✔-Providing a
sloped, or stepped, seating arrangement



After presenting a proposal, what is the correct plan of action for following up with the client? - ✔✔-
Regularly, until a decision is made



AV professionals determine the end user's needs by examining three things: the required applications,
the tasks, and the: - ✔✔-Functions to support the applications



When working with a client to design an AV solution for a new conference center, the client requests a
detailed budget for the equipment and installation. What phase is the project in? - ✔✔-Design phase



The HDTV aspect ratio is equal to which of the following? - ✔✔-1.78:1



Please select the appropriate resolution for SXGA. - ✔✔-1280 x 1024



The Brightness control adjusts which level? - ✔✔-Black Level



For what purpose would the AV technician designate a loopback internet protocol address in the
127.0.0.1 to 127.255.255.254 range in a network configuration? - ✔✔-To test the local device to see if
TCP/IP is working on your system



It is important to consider Polar Patterns when____ - ✔✔-Selecting Microphones for use at live events
$10.49
Vollständigen Zugriff auf das Dokument erhalten:

100% Zufriedenheitsgarantie
Sofort verfügbar nach Zahlung
Sowohl online als auch als PDF
Du bist an nichts gebunden


Ebenfalls erhältlich im paket-deal

Lerne den Verkäufer kennen

Seller avatar
Bewertungen des Ansehens basieren auf der Anzahl der Dokumente, die ein Verkäufer gegen eine Gebühr verkauft hat, und den Bewertungen, die er für diese Dokumente erhalten hat. Es gibt drei Stufen: Bronze, Silber und Gold. Je besser das Ansehen eines Verkäufers ist, desto mehr kannst du dich auf die Qualität der Arbeiten verlassen.
PassPoint02 Chamberlain School Of Nursing
Folgen Sie müssen sich einloggen, um Studenten oder Kursen zu folgen.
Verkauft
173
Mitglied seit
3 Jahren
Anzahl der Follower
105
Dokumente
4552
Zuletzt verkauft
6 Jahren vor

4.1

39 rezensionen

5
22
4
6
3
5
2
4
1
2

Kürzlich von dir angesehen.

Warum sich Studierende für Stuvia entscheiden

on Mitstudent*innen erstellt, durch Bewertungen verifiziert

Geschrieben von Student*innen, die bestanden haben und bewertet von anderen, die diese Studiendokumente verwendet haben.

Nicht zufrieden? Wähle ein anderes Dokument

Kein Problem! Du kannst direkt ein anderes Dokument wählen, das besser zu dem passt, was du suchst.

Bezahle wie du möchtest, fange sofort an zu lernen

Kein Abonnement, keine Verpflichtungen. Bezahle wie gewohnt per Kreditkarte oder Sofort und lade dein PDF-Dokument sofort herunter.

Student with book image

“Gekauft, heruntergeladen und bestanden. So einfach kann es sein.”

Alisha Student

Häufig gestellte Fragen