ACQ 101 module 6 Work Breakdown Structure 2023 complete update solution
ACQ 101 module 6 Work Breakdown Structure 2023 complete update solution DoD components and contractors use WBSs as a foundation to establish schedules and formulating budgets. - The DoD provides guidance for the development of a standardized WBS. The principal document that describes these structures is derived from which of the following? - The principal document that the DoD employs in developing and standardizing WBS is the "DoD standard practice work breakdown structures for defense materiel items." In the document, how many types of systems are covered? - What are the common elements of WBSs? - Which of the following is referred to as the "product part" of a WBS? The common elements of a WBS are elements common to all acquisition programs developed by the DoD. Common elements can be found at all levels of a WBS. They are the actual configuration items of the system, and enable the realization of the system Program WBS is controlled and maintained by? - Contract WBS is controlled and maintained by? - WBS Level 3 elements are subordinate elements of each Level 2 major element. Which of the following are identified as level 3 elements? The Program WBS has 3 levels; what are they and what do they cover? Contract WBS defines that part of the program that is being produced by a given contractor and is the basis for collecting cost and schedule data for the contract. - Which of the following are the levels included in the Program WBS? What are the two types of WBS? What is the Control Account Manager CAM responsible for? - WBS plays a significant role in which of the following? - The WBS provides a consistent and visible framework for materiel items and contracts within a program throughout its life cycle. - The Program WBS covers the acquisition of a specific defense materiel item. The Contract WBS begins at what level? -
Written for
- Institution
-
National Defense University
- Course
-
ACQ 101
Document information
- Uploaded on
- December 29, 2022
- Number of pages
- 3
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Unknown
Subjects
- acq 101 module 6
-
acq 101 module 6 work breakdown structure 2023 complete update solution
Also available in package deal