The purpose of this code is to establish _________ requirements to safeguard the public safety, health and general welfare. - minimum 2018 IRC Section R101.3 Intent. Where, in any specific case, different sections of this code specify different materials, methods of construction or other requirements, the most _________ shall govern. - restrictive 2018 IRC Section R102.1 General. Where a referenced code or standard includes subject matter that is within the scope of the IRC, the provisions of the _________ shall take precedence. - IRC 2018 IRC Section R102.4.2 Provisions in referenced codes and standards. An alternative material or method shall be approved where the proposed design is _________ and complies with the _________ of the code. - satisfactory intent

Show more Read less
Institution
Course










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Course

Document information

Uploaded on
November 4, 2022
Number of pages
16
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

IRC 2018 Exam with COMPLETE SOLUTION | 100 Questions
with 100% Correct Answers
The purpose of this code is to establish
_________ requirements to safeguard
the public safety, health and general
welfare. Correct Answer: minimum

2018 IRC Section R101.3 Intent.

Where, in any specific case, different
sections of this code specify different
materials, methods of construction or
other requirements, the most _________
shall govern. Correct Answer: restrictive

2018 IRC Section R102.1 General.

Where a referenced code or standard
includes subject matter that is within
the scope of the IRC, the provisions of
the _________ shall take precedence. Correct Answer: IRC

2018 IRC Section R102.4.2 Provisions in referenced codes and standards.

An alternative material or method shall be approved where the proposed design is _________
and complies with the _________ of the code. Correct Answer: satisfactory
intent

2018 IRC Section R104.11 Alternative materials, design and methods of
construction and equipment.
Copyright

Compliance with the specific _________
-based provisions of the International
Codes in lieu of specific requirements
of the IRC shall be permitted as an
alternative. Correct Answer: performance

2018 IRC Section R104.11 Alternative materials, design and methods of construction and
equipment.

A permit is not required for one-story
detached accessory structures,
provided that the floor area does not
exceed _________ square feet. Correct Answer: 200

,2018 IRC Section R105.2 Work exempt from permit, Building: Item 1.

Fences that are _________ feet or less in
height do not require permits. Correct Answer: 7

2018 IRC Section R105.2 Work exempt from permit, Building: Item 2.

A permit is not required for the
replacement of branch circuit
overcurrent devices (breakers) of the
required capacity in the same location
(within a panel). Correct Answer: True

2018 IRC Section R105.2 Work exempt from permit, Electrical: Item 3.

Unattached decks not exceeding
_________ square feet in area, that are
not more than _________ inches above
grade, do not require a permit. Correct Answer: 200
30

2018 IRC Section R105.2 Work exempt from permit, Building: Item 10.

Where equipment replacements and
repairs must be performed in an
emergency situation, the permit
application shall be submitted within
the _________ _________ business day. Correct Answer: next working

...to the building official.

2018 IRC Section R105.2.1 Emergency repairs.

An application for a permit for any
proposed work shall be deemed to have
been abandoned _________ days after
the date of filing. Correct Answer: 180
180 days also applies to extensions.

2018 IRC Section R105.3.2 Time limitation of application.

Before issuing a permit, the building
official is _________ to examine or
cause to be examined buildings,
structures and sites for which an

, application has been filed. Correct Answer: authorized

2018 IRC Section R105.9 Preliminary inspection.

Where the building official issues a
permit, the construction documents
shall be approved in writing or by a
stamp which states _________
_________ _________ _________ . Correct Answer: REVIEWED FOR
CODE COMPLIANCE

2018 IRC Section R106.3.1 Approval of construction documents.

Final inspection shall be made after the
permitted work is _________ and prior
to _________ . Correct Answer: complete
occupancy

2018 IRC Section R109.1.6 Final inspection.

If located in a flood hazard area, the
documentation of elevations required
in Section R322.1.10 shall be submitted
to the building official prior to the
_________ inspection. Correct Answer: final

2018 IRC Section R109.1.6.1 Elevation documentation.

Signifies access that requires the removal of an access panel or similar removable obstruction.
Correct Answer: Access (to)

Ready Access (to) signifies access without the necessity for removing a
panel or similar obstruction

2018 IRC Section R202 Definitions.

A finished or unfinished habitable
space within an attic. Correct Answer: Attic, Habitable

Other conditions relating to occupiable floor area must also be met.

2018 IRC Section R202 Definitions.

Hot water is water at a temperature
greater than or equal to _________ °F. Correct Answer: 110
$11.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Reviews from verified buyers

Showing all reviews
1 year ago

It seems someone just copied and paste this questions from another exam

1.0

1 reviews

5
0
4
0
3
0
2
0
1
1
Trustworthy reviews on Stuvia

All reviews are made by real Stuvia users after verified purchases.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
HIGHFLYER Yale School Of Medicine
Follow You need to be logged in order to follow users or courses
Sold
288
Member since
3 year
Number of followers
263
Documents
1829
Last sold
4 months ago

4.0

82 reviews

5
43
4
16
3
11
2
5
1
7

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions