Point Assessment
,Able Skills AM2S End Point Assessment
Question 1
A professional recommendation must remain closely tied to the relationship between
continuity of protective conductors, including main, and supplementary bonding. Which
subject should underpin it?
A. Continuity of protective conductors (including main and supplementary bonding)
B. Documentation
C. Insulation resistance testing
D. Completion of official electrical installation certificates and schedule of test results
Correct Answer: A
Full Explanation:
Option A should be selected. “Continuity of protective conductors (including main and supplementary bonding)”
directly addresses the relationship between continuity of protective conductors, including main, and supplementary
bonding, which is the decision point described. By contrast, option B concerns documentation; option C concerns
insulation resistance testing; and option D concerns completion of official electrical installation certificates and
schedule of test…. They may still be useful elsewhere, but none is the primary answer here.
Question 2
When a recurring problem is being examined, the objective is to strengthen capability
related to practical decisions involving mandatory Statutory Testing, incorporating
provisions, and electrically sensitive equipment. What should be prioritised?
A. Mandatory Statutory Testing (incorporating provisions for electrically sensitive equipment)
B. Operation of the isolator, locking off, and application of mandatory warning notices
C. Task 2: Safe isolation to facilitate the replacement of a designated three-phase piece of equipment
D. Task 1: Safe isolation to facilitate the replacement of a designated single-phase piece of equipment
Correct Answer: A
Full Explanation:
The requirement is met most directly by option A. “Mandatory Statutory Testing (incorporating provisions for
electrically sensitive equipment)” directly addresses practical decisions involving mandatory Statutory Testing,
incorporating provisions, and electrically sensitive equipment, which is the decision point described. Each distractor
belongs elsewhere: option B concerns operation of the isolator, locking off, and application of mandatory warning…;
option C concerns safe isolation to facilitate the replacement of a designated three-phase piece…; and option D
concerns safe isolation to facilitate the replacement of a designated single-phase piece…. That distinction keeps the
response aligned with the actual decision point.
Question 3
A team is converting a broad requirement into practical action concerning how execution
of a comprehensive visual examination of the completed composite installation prior to
energization, ensuring compliance, and BS 7671 should be integrated. Which area should
guide the work?
A. PVC/PVC Multi-core & CPC Cable: Installation and termination for general power and lighting
B. Visual Inspection
C. Execution of a comprehensive visual examination of the completed composite installation prior to
energization, ensuring compliance with BS 7671
D. Functional testing of equipment, protective devices, and control systems
Correct Answer: C
Full Explanation:
The strongest response is option C. “Execution of a comprehensive visual examination of the completed composite
installation prior to energization, ensuring compliance with BS 7671” directly addresses how execution of a
comprehensive visual examination of the completed composite installation prior to energization, ensuring
compliance, and BS 7671 should be integrated, which is the decision point described. The three alternatives do not
meet the stated need: option A concerns installation and termination for general power and lighting; option B
concerns visual Inspection; and option D concerns functional testing of equipment, protective devices, and control
systems. The selected option is therefore the clearest basis for action.
2
,Able Skills AM2S End Point Assessment
Question 4
Which topic is the clearest match for a scenario whose defining feature is visual
Inspection?
A. Phase sequence and phase rotation checks
B. Visual Inspection
C. Completion of official electrical installation certificates and schedule of test results
D. Core Subject Areas
Correct Answer: B
Full Explanation:
The primary focus is captured by option B. “Visual Inspection” directly addresses visual Inspection, which is the
decision point described. The remaining choices shift the emphasis: option A concerns phase sequence and phase
rotation checks; option C concerns completion of official electrical installation certificates and schedule of test…;
and option D concerns core Subject Areas. They therefore cannot replace the selected focus in this situation.
Question 5
A corrective action is being designed around hours). Which topic belongs at its centre?
A. Sections A2-A6: Composite Installation (Time Allowed: 10 Hours)
B. Safe Isolation Procedure
C. Earth fault-loop impedance (EFLI) testing
D. Hours)
Correct Answer: D
Full Explanation:
Option D provides the closest match. “Hours)” directly addresses hours), which is the decision point described. The
incorrect choices solve different problems: option A concerns composite Installation (Time Allowed: 10 Hours);
option B concerns safe Isolation Procedure; and option C concerns earth fault-loop impedance (EFLI) testing.
Accordingly, the other choices should be treated as secondary or out of scope.
Question 6
Which area should a quality reviewer examine when the concern is how inspection and
Testing and certification and Time Allowed should be integrated?
A. Sections A2-A6: Composite Installation (Time Allowed: 10 Hours)
B. Section B: Inspection, Testing and Certification (Time Allowed
C. Section D: Fault Diagnosis and Rectification (Time Allowed: 2 Hours)
D. PVC/PVC Multi-core & CPC Cable: Installation and termination for general power and lighting
Correct Answer: B
Full Explanation:
Option B is correct. “Section B: Inspection, Testing and Certification (Time Allowed” directly addresses how
inspection and Testing and certification and Time Allowed should be integrated, which is the decision point
described. The alternatives address different concerns: option A concerns composite Installation (Time Allowed: 10
Hours); option C concerns fault Diagnosis and Rectification (Time Allowed: 2 Hours); and option D concerns
installation and termination for general power and lighting. For that reason, they do not provide the closest fit to the
stated objective.
3
, Able Skills AM2S End Point Assessment
Question 7
Which area would give the clearest basis for interpreting the relationship between
connection of a 3-phase direct-on-line and DOL and motor circuit?
A. Continuity of ring final circuit conductors
B. FP200 Type Cable: Installation and termination for fire alarm and safety service circuits
C. Section D: Fault Diagnosis and Rectification (Time Allowed: 2 Hours)
D. Motor Circuits: Connection of a 3-phase direct-on-line (DOL) motor circuit
Correct Answer: D
Full Explanation:
Option D is the only choice that fully aligns. “Motor Circuits: Connection of a 3-phase direct-on-line (DOL) motor
circuit” directly addresses the relationship between connection of a 3-phase direct-on-line and DOL and motor
circuit, which is the decision point described. The other options are relevant in other contexts, but option A concerns
continuity of ring final circuit conductors; option B concerns installation and termination for fire alarm and safety
service circuits; and option C concerns fault Diagnosis and Rectification (Time Allowed: 2 Hours). This makes the
selected option the most precise and source-bound choice.
Question 8
Which subject is most closely associated with Circuit and Equipment Installation, rather
than with a different section of practice?
A. SY Multi-flex Cable: Installation, termination, and connection for specialized applications (e.g., motor circuits)
B. Protective Bonding: Installation of main protective equipotential bonding conductors to incoming gas and
water service pipes
C. Identification of the correct point of isolation and notification of relevant personnel/customers
D. XLPE SWA (Steel Wire Armoured) Cable: Installation, glanding, termination, and connection for sub-mains
and heavy-duty circuits
Correct Answer: B
Full Explanation:
The scenario points most clearly to option B. “Protective Bonding: Installation of main protective equipotential
bonding conductors to incoming gas and water service pipes” is directly associated with Circuit and Equipment
Installation and therefore remains inside the stated scope. The alternatives address different concerns: option A
concerns installation, termination, and connection for specialized applications (e.g.…; option C concerns
identification of the correct point of isolation and notification of relevant…; and option D concerns installation,
glanding, termination, and connection for sub-mains and heavy-duty…. For that reason, they do not provide the
closest fit to the stated objective.
Question 9
A review is restricted to Circuit and Equipment Installation. Which subject falls most
directly within that scope?
A. Safety and Sustainable Energy Services: Installation of carbon monoxide detector safety circuits and S Plan
central heating/hot water systems featuring…
B. Identification of workplace hazards, evaluation of risks, and determination of precautions
C. Advanced understanding and practical interpretation of BS 7671 (IEE Wiring Regulations)
D. Specification of mandatory follow-up tests and verification steps required to prove the fault has been
successfully rectified
Correct Answer: A
Full Explanation:
The most defensible choice is option A. “Safety and Sustainable Energy Services: Installation of carbon monoxide
detector safety circuits and S Plan central heating/hot water systems featuring…” is directly associated with Circuit
and Equipment Installation and therefore remains inside the stated scope. The other options are relevant in other
contexts, but option B concerns identification of workplace hazards, evaluation of risks…; option C concerns
advanced understanding and practical interpretation of BS 7671 (IEE Wiring…; and option D concerns specification
of mandatory follow-up tests and verification steps required to…. This makes the selected option the most precise
and source-bound choice.
4