Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

CMIT Exam (200 multiple choice) Questions With Complete Solutions

Rating
-
Sold
-
Pages
38
Grade
A+
Uploaded on
01-03-2026
Written in
2025/2026

CMIT Exam (200 multiple choice) Questions With Complete Solutions

Institution
Cmit
Course
Cmit

Content preview

CMIT Exam (200 multiple choice) Questions With Complete
Solutions

21.
In a CM-at-Risk arrangement once construction begins and the
CM converts from the professional advisory role of a CM to the
contractual role of a general contractor, the CM has no implied
duties of loyalty and care to the owner.
True False Correct Answers True

A 5D BIM model incorporates which project attribute?
A) Schedule
B) Quality
C) Phasing
D) Cost Correct Answers D) Cost

A CM must be aware of its contractual obligations regarding
safety on the project site.
True False Correct Answers True

A CM must purchase insurance coverage for protection against
claims by its own employees.
True False Correct Answers True

A CM response/proposal to an owner's request for proposal can
be considered an offer to enter into a contract.
True False Correct Answers True

A CM should seek the advice of legal counsel when preparing or
modifying contracts.
True False Correct Answers True

,A CM under an agency relationship, with the owner managing
multi-prime contractors, must consider its own risk first in
managing those contractors.
True False Correct Answers True

A CM, acting as an agent of the owner, will bond a multi-prime
job.
True False Correct Answers False

A CM's liability is determined solely by whether or not the CM
performed according to the required standard of care.
True False Correct Answers False

A CM's role and responsibilities are governed solely by the
Owner/CM Agreement.
True False Correct Answers True

A contract is an arrangement for the distribution of construction
project risk between the parties.
True False Correct Answers True

A cost plus fixed fee contract is what type of contract?
A) Cost reimbursement
B) Lump sum
C) Time & material
D) Unit price Correct Answers A) Cost reimbursement

A Dispute Review Board does not meet until there is a dispute.
True False Correct Answers False

,A general contractor working under a fixed price contract will
always put its interests ahead of the owner.
True False Correct Answers True

A guaranteed maximum price can never change.
True False Correct Answers False

A key advantage of the traditional delivery approach is:
A) With the traditional delivery system, the cost of the
construction phase is known before construction starts.
B) Facility features are fully determined & specified.
C) When the construction contract is signed, the major risk
belongs to the contractor.
D) All of the above Correct Answers B) Facility features are
fully determined & specified.

A key element leading to successful project management is
decision making based on adequate information.
True False Correct Answers True

A legal relationship by which one party is empowered and
obligated to act on behalf of another party is called:
A) An agreement
B) Agency
C) Addenda
D) A contract Correct Answers B) Agency

A limitation provision seeks to limit a party's liability to the
party's client.
True False Correct Answers True

, A mediator cannot impose an agreement upon the parties.
True False Correct Answers True

A method of compensation that creates a potential for conflict of
interest between the owner's interests and the CM's interests is
indicative of an agency CM relationship.
True False Correct Answers False

A mini-trial, whether required by contract or agreed to
voluntarily, results in a binding decision.
True False Correct Answers False

A project delivery approach that is gaining acceptance for
allocating risks among project teams is referred to as the
________ method.
A) D-B
B) IPD
C) FAR
D) D-B-B Correct Answers B) IPD

A project management system that utilizes a periodic consistent
measurement of work performed in terms of budget is known as
a ____________ system?
A) CPM
B) ISO
C) Earned value
D) Value engineering Correct Answers C) Earned value

A project schedule must always be in a CPM format.
True False Correct Answers False

Written for

Institution
Cmit
Course
Cmit

Document information

Uploaded on
March 1, 2026
Number of pages
38
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$19.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Classroom NURSING
View profile
Follow You need to be logged in order to follow users or courses
Sold
4827
Member since
4 year
Number of followers
3229
Documents
55038
Last sold
6 hours ago
NURSING

Assignments, Case Studies, Research, Essay writing service, Questions and Answers, Discussions etc. for students who want to see results twice as fast. I have done papers of various topics and complexities. I am punctual and always submit work on-deadline. I write engaging and informative content on all subjects. Send me your research papers, case studies, psychology papers, etc, and I’ll do them to the best of my abilities. Writing is my passion when it comes to academic work. I’ve got a good sense of structure and enjoy finding interesting ways to deliver information in any given paper. I love impressing clients with my work, and I am very punctual about deadlines. Send me your assignment and I’ll take it to the next level. I strive for my content to be of the highest quality. Your wishes come first— send me your requirements and I’ll make a piece of work with fresh ideas, consistent structure, and following the academic formatting rules. For every student you refer to me with an order that is completed and paid transparently, I will do one assignment for you, free of charge!!!!!!!!!!!!

Read more Read less
4.0

1177 reviews

5
622
4
214
3
193
2
39
1
109

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions