CGP applies when?- Anything one acre or more of construction or demolition of
Activities NOT regulated under the CGP include:
a. Routine maintenance to maintain original line and grade, hydraulic capacity, or
original purpose of the facility.
b. Disturbances to land surfaces solely related to agricultural operations.
c. Clearing and grading 2 acres
d. Discharges of storm water from areas on tribal lands. -Answer C
TRUE OR FALSE: If construction of an LUP will cross more than one property, the utility
company, municipality or other public/private company/agency that owns or operates
the LUP project must seek coverage - Answer True
On-site Risk Level 2 monitoring requirements include:
a. Effluent sampling where applicable
b. Sampling for pH and turbidity
c. Sampling for pH, turbidity, and suspended sediments - Answer B
All NAL data shall be uploaded within after NAL exceedance has been identified
a. 24 hours
b. 1 week
c. 10 days
d. 2 weeks - Answer C
Who shall file Permit Registration Documents (PRDs) before commencing construction
, activity?
a. Qualified SWPPP Developer (QSD)
b. Legally Responsible Person (LRP) or the LRP's Approved Signatory
c. Qualified SWPPP Practitioner (QSP)
d. The CEO - Answer B
Which rule provides a framework for regulating storm water discharges to waters of the
United States from municipalities and industries? :
a. Clean Water Act (CWA)
b. Porter-Cologne Water Quality Control Act
c. Endangered Species Act
d. U.S. Environmental Protection Agency (USEPA)
e. California Environmental Quality Act (CEQA) - Answer A
It may be necessary for certain non-storm water discharges to be implemented as part
of a construction project. Thus, such discharges are authorized under the General
Permit to the extent that they satisfy the following conditions except for:
a. Must attain the NALs for pH and turbidity
b. Shall not cause or contribute to a violation of applicable water quality standards
c. Shall be implemented with BMPs as specified in the SWPPP
d. For which it is infeasible to eliminate
e. Causes or threatens to cause pollution, contamination, or nuisance - Answer E
When feasible, use erosion controls as the protection, with sediment controls as a
system.
a. primary, secondary
b. secondary, primary - Answer A
A temporary or permanent structural BMP which conveys concentrated flows away from