100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

WGU C722 PROJECT MANAGEMENT OA FINAL EXAM BANK CURRENTLY TESTING COMPLETE EXAM QUESTIONS WITH DETAILED VERIFIED ANSWERS /EXPERT VERIFIED /ALREADY GRADED A+/BRAND NEW!!

Puntuación
-
Vendido
-
Páginas
25
Grado
A+
Subido en
15-01-2026
Escrito en
2025/2026

WGU C722 PROJECT MANAGEMENT OA FINAL EXAM BANK CURRENTLY TESTING COMPLETE EXAM QUESTIONS WITH DETAILED VERIFIED ANSWERS /EXPERT VERIFIED /ALREADY GRADED A+/BRAND NEW!! WGU C722 PROJECT MANAGEMENT OA FINAL EXAM BANK CURRENTLY TESTING COMPLETE EXAM QUESTIONS WITH DETAILED VERIFIED ANSWERS /EXPERT VERIFIED /ALREADY GRADED A+/BRAND NEW!! WGU C722 PROJECT MANAGEMENT OA FINAL EXAM BANK CURRENTLY TESTING COMPLETE EXAM QUESTIONS WITH DETAILED VERIFIED ANSWERS /EXPERT VERIFIED /ALREADY GRADED A+/BRAND NEW!!

Mostrar más Leer menos
Institución
WGU C722 PROJECT MANAGEMENT OA
Grado
WGU C722 PROJECT MANAGEMENT OA










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
WGU C722 PROJECT MANAGEMENT OA
Grado
WGU C722 PROJECT MANAGEMENT OA

Información del documento

Subido en
15 de enero de 2026
Número de páginas
25
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

  • wgu c722
  • wgu

Vista previa del contenido

WGU - C722 EXAM| QUESTIONS AND ANSWERS | 2026/2027 UPDATE |
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




m0




Time Management Plan _ANSWER-Explains how the schedule will be developed,
m0 m0 m0 m0 m0 m0 m0 m0 m0




monitored and controlled.
m0 m0 m0




Configuration Management Plan _ANSWER-Documents how the project team and
m0 m0 m0 m0 m0 m0 m0 m0




stakeholders will keep track of the versions of project documents to ensure that the
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




most up-to-date document is in use.
m0 m0 m0 m0 m0 m0




Change Management Plan _ANSWER-Documents how changes to the project outcomes
m0 m0 m0 m0 m0 m0 m0 m0 m0




will be managed, approved, implemented, and monitored.
m0 m0 m0 m0 m0 m0 m0




Process Improvement Plan _ANSWER-Describes how the processes and procedures used
m0 m0 m0 m0 m0 m0 m0 m0 m0




on the project will be evaluated to ensure that the most efficient methods are
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




implemented.
m0




Requirements Management Plan _ANSWER-Documents how the customer and m0 m0 m0 m0 m0 m0 m0




stakeholder requirements will be identified, integrated to the project scope, tracked
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




throughout the project, and verified at closure.
m0 m0 m0 m0 m0 m0 m0




monitoring and controlling _ANSWER-It is central to the PM's role to know the status of the
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




project work (monitor) and take action as needed to ensure the project plan is
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




completed as planned (control).
m0 m0 m0 m0




lessons learned _ANSWER-have great value to the project organization because they
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




provide guidance for future projects.
m0 m0 m0 m0 m0

,The triple constraint concept _ANSWER-It is not possible to change any one side of a
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




triangle without affecting the other two characteristics
m0 m0 m0 m0 m0 m0 m0




The triple constraints are: _ANSWER-Time, Cost, Scope
m0 m0 m0 m0 m0 m0




project scope _ANSWER-is, simply put, what the result of the project is desired to be.
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




statement of work (SOW) _ANSWER-It defines the product of the project.
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




Scope creep _ANSWER-occurs when there are any—but particularly small—incremental
m0 m0 m0 m0 m0 m0 m0 m0




additions to the project scope that are not subject to the formal scope change process.
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




critical path _ANSWER-is defined as the path with the longest duration from the start of the
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




project to its completion.
m0 m0 m0 m0




Float time/slack time _ANSWER-is the amount of time an activity can be delayed without
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




affecting the completion date of the project.
m0 m0 m0 m0 m0 m0 m0




Administrative activities _ANSWER-during the project closing phase include performancem0 m0 m0 m0 m0 m0 m0 m0




report preparation, return of assets to the sponsoring organizations, archival of records,
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




and documentation of lessons learned.
m0 m0 m0 m0 m0




Customer delivery activities _ANSWER-project closing phase include returning excess
m0 m0 m0 m0 m0 m0 m0 m0




materials, reconciling accounts payable, and preparing required financial reports.
m0 m0 m0 m0 m0 m0 m0 m0 m0




Milestones _ANSWER-in a project schedule identify critical events and other activities that
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




must be performed by specific dates before the project may proceed.
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




Iterative planning processes _ANSWER-allows the project to move forward in phases when
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




not enough information is known to plan the entire project
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




common components of project scope statements _ANSWER-Project constraints, project
m0 m0 m0 m0 m0 m0 m0 m0




acceptance criteria and technical requirements
m0 m0 m0 m0 m0




Project schedule _ANSWER-A timeline that specifies when the project begins and when it is
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




supposed to end
m0 m0 m0




Project cost _ANSWER-The sum total of all expenses directly charged to the project
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




Traditional project management methods _ANSWER-PERT, CPM, critical chain, waterfall,
m0 m0 m0 m0 m0 m0 m0 m0




and PRINCE2
m0 m0




Project evaluation and review technique (PERT) _ANSWER-was developed in the 1950s to
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




support the U.S. Navy's Polaris missile project. It uses a statistical approach to
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




estimate the time that will be required to complete project work activities.
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0

, Critical path method (CPM) _ANSWER-was developed for the DuPont Corporation to help
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




with projects in their manufacturing plants. It used for estimating project activity
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




durations but CPM assumes that the estimates do not vary and time can be reliably
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




estimated.
m0




Critical chain project management (CCPM) _ANSWER-focuses on managing the
m0 m0 m0 m0 m0 m0 m0 m0




uncertainties of a project. It assumes that resources available to complete the project
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




are in limited supply and it specifically plans to ensure resource availability.
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




Waterfall _ANSWER-is a traditional practice which found its best use in software and
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




hardware development.
m0 m0




Extreme _ANSWER-addresses issues of extraordinary uncertainty or complexity.
m0 m0 m0 m0 m0 m0 m0




PRINCE2 _ANSWER-is a highly structured project management method which focuses on
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




the specification of the outputs rather than the coordination of activities
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




duration _ANSWER-describe the number of time periods required to complete some
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




portion of the work.
m0 m0 m0 m0




activities _ANSWER-are the starting point for developing the project schedule because
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




they identify specific work that will need to occur in order to execute the project.
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




Deterministic duration estimation techniques _ANSWER-are appropriate when the activity
m0 m0 m0 m0 m0 m0 m0 m0




durations are very predictable.
m0 m0 m0 m0




Probabilistic duration estimation techniques _ANSWER-are used when there is uncertainty
m0 m0 m0 m0 m0 m0 m0 m0 m0




in how long an activity will take.
m0 m0 m0 m0 m0 m0 m0




one-point estimate _ANSWER-requires that the team expert provide a reliable estimate of
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




the time necessary to complete the activity.
m0 m0 m0 m0 m0 m0 m0




triangular distribution _ANSWER-Activity Duration=O+M+P/3
m0 m0 m0




beta distribution _ANSWER-uses the three estimates (optimistic, most likely, and
m0 m0 m0 m0 m0 m0 m0 m0 m0




pessimistic) but places emphasis on the most likely estimate. Activity
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




Duration=O+4M+P/6
m0




learning curves _ANSWER-that as a person repeats a task, the time required to complete
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




the task decreases.
m0 m0 m0




Other factors that can influence the impact of learning curves _ANSWER-The complexity of
m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0 m0




the activity
m0 m0




The level of human input required The
m0 m0 m0 m0 m0 m0




duration of the activity
m0 m0 m0 m0
$18.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
Wisdomstudys

Conoce al vendedor

Seller avatar
Wisdomstudys Howard Community College
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1
Miembro desde
3 meses
Número de seguidores
0
Documentos
256
Última venta
1 semana hace
Wisdomstudys

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes