QUESTIONS AND ANSWERS 2026 LATEST UPDATED | 100% GRADED
CORRECT | 100% GUARANTEED TO PASS | GET A+
Suppose that the specifications for a part (in inches) are 6.00 ± 0.25. The loss right at the range
limits is $1000. What is the loss at 6.7 inch? Show answer dollars and cents ( like $45.67). -
(ANSWER)1000/(.25)^2= 16000
16000(6-6.7)^2= $7840.00
Given the diagram below, determine the system reliability if the individual component
reliabilities are: A = .89, B = 0.93, C = 0.92, and D = 0.94. - (ANSWER)Parallel Product
Reliabilities formula:
[1-(1-.89)*(1-.93)]*[1-(1-.92)*(1-.94)]=
[1-(.11*.07)]*[1-(.08*.06)]=
(1-.0077)*(1-.0048)=
.9923*.9952=.9875
Anna works on an assembly line where it takes her 20 minutes to produce 40 units of a product
needed to fill a container. It takes her an additional 5 minutes to transport the container to Josh,
who works at the next station. The company uses a safety stock of 15%. The current assembly
,line uses 5 KanBans between Anna's and Josh's stations. What is the demand for the product?
Round to nearest unit. - (ANSWER)Kanban Formula:
25/60= .4167
5=d(.4167)(1.15)/40
200=.4792d
d=417.36
The owners of Speedy Logistics, a company that provides overnight delivery of documents, are
considering where to locate their new facility in the Midwest. They have narrowed their search
down to two locations and have decided to use factor rating to make their decision.They have
listed the factors they consider important and assigned a factor score to each location based on a
5-point scale 1 lowest, 5 highest). The information is shown here. What is the best location, and
what is its factor rating score? (Location 1 459) - (ANSWER)Multiply across:
Location 1-
20*3=60
30*0=0
10*5=50
40*1=40
L1=150
L2=380
,Answer: Location 2, 380
Aalogistics Co. has just signed a contract to deliver products to three locations, and they are
trying to decide where to put their new warehouse. The three delivery locations are
Chicago,Kansas City, and Memphis. Which town would be the best place to put the warehouse? -
(ANSWER)X or Y Coordinate*Load/Total Load Amt=
82(58)+85(150)+90(95)/303=85.99
64(58)+45(150)+35(95)/303= 45
Closest Answer= Punchout X84 Y56
The following table shows the tasks required to assemble an aluminum storm door and the length
of time needed to complete each task.
What is the maximum output per hour for this line with an operator at each station? Round to
nearest unit. - (ANSWER)Take the highest number (In this case the highest number is 56) and
always use 3600 as the numerator: 3600/56=64
An assembly line consists of 158 tasks grouped into 32 work stations. The sum of all task times
is105 minutes. The largest assigned cycle time is 4 minutes. The efficiency of this line is
approximately: - (ANSWER)Efficiency Formula:
time/(# of stations)*(cycle time or bottleneck)
, 105/32(4)=82%
What is the reliability of a four-component product, with components in series, and component
reliabilities of .90, .95, .98, and .99?
A) 0.8295
B) 0.90
C) 0.955
D) 0.99
E) 0.945 - (ANSWER)A) .8295
A system is composed of three components A, B, and C. All three must function for the system to
function. There are currently no backups in place. The system has a reliability of 0.966. If a
backup is installed for component A, the new system reliability will be:
A) unchanged.
B) less than 0.966.
C) greater than it would be if a backup were also installed for component B.
D) greater than 0.966
E) none of the above - (ANSWER)D)