LGAV 3110 FINAL EXAM PREP 2026/2027 ACCURATE
QUESTIONS WITH CORRECT DETAILED ANSWERS || 100%
GUARANTEED PASS < RECENT VERSION >
The _________ department evaluates maintenance requirements and
establishes the maintenance program for the airline.
Mechanics
Maintenance
Engineering
PP&C - (ANSWERS)Engineering
An EO can be initiated due to
A reliability program alert
Work force requirement
AD, SB, or SL
All of the above - (ANSWERS)All of the above
________study the practical aspects of aviation systems and equipment
while ________are trained in the basics of science and are 'problem solvers'
Designers, Avionics specialists
Technicians, Troubleshooters
Mechanics, Engineers
Maintenance Engineers, Managers - (ANSWERS)Mechanics, Engineers
One of the primary functions of Engineering is
Aircraft repair
New equipment evaluation
Forecasting future problems
,LGAV 3110 FINAL EXAM PREP 2026/2027 ACCURATE
QUESTIONS WITH CORRECT DETAILED ANSWERS || 100%
GUARANTEED PASS < RECENT VERSION >
Resource management - (ANSWERS)New equipment evaluation
Engineering is considered a substitute for maintenance when mechanics are
unable to solve a problem.
True
False - (ANSWERS)False
PP&C controls maintenance by
Adjusting the plan and keeping checks on schedule
Creating long and short-term maintenance models for mechanics to follow
Planning routing, variable routine, and non-routine tasks
Writing technical publications for future planning - (ANSWERS)Adjusting
the plan and keeping checks on schedule
Planning and scheduling the appropriate manpower, parts and facilities are
examples of PP&C's _____ function.
Forecasting
Production
Planning
Controlling - (ANSWERS)Planning
PP&C is primarily responsible for
Scheduling daily, 48-hour, and transit checks
Ordering parts and estimating the amount of labor needed for unscheduled
, LGAV 3110 FINAL EXAM PREP 2026/2027 ACCURATE
QUESTIONS WITH CORRECT DETAILED ANSWERS || 100%
GUARANTEED PASS < RECENT VERSION >
maintenance
Planning and scheduling all aircraft maintenance activity within an airline
Providing feedback on completed maintenance jobs - (ANSWERS)Planning
and scheduling all aircraft maintenance activity within an airline
Schedules for checks and known modifications are finalized in which type
of forecast?
Long-term
Intermediate term
Short-Term
Extended-term - (ANSWERS)Short-Term
This PP&C function is considered an 'idealized' responsibility
Forecasting
Production
Planning
Controlling - (ANSWERS)Planning
Preliminary planning consists of
Implementing maintenance actions
Developing the maintenance program by engineering
Providing feedback from mechanics to PP&C for more accurate future
planning
Coordinating with flight operations and group handling -
(ANSWERS)Developing the maintenance program by engineering
QUESTIONS WITH CORRECT DETAILED ANSWERS || 100%
GUARANTEED PASS < RECENT VERSION >
The _________ department evaluates maintenance requirements and
establishes the maintenance program for the airline.
Mechanics
Maintenance
Engineering
PP&C - (ANSWERS)Engineering
An EO can be initiated due to
A reliability program alert
Work force requirement
AD, SB, or SL
All of the above - (ANSWERS)All of the above
________study the practical aspects of aviation systems and equipment
while ________are trained in the basics of science and are 'problem solvers'
Designers, Avionics specialists
Technicians, Troubleshooters
Mechanics, Engineers
Maintenance Engineers, Managers - (ANSWERS)Mechanics, Engineers
One of the primary functions of Engineering is
Aircraft repair
New equipment evaluation
Forecasting future problems
,LGAV 3110 FINAL EXAM PREP 2026/2027 ACCURATE
QUESTIONS WITH CORRECT DETAILED ANSWERS || 100%
GUARANTEED PASS < RECENT VERSION >
Resource management - (ANSWERS)New equipment evaluation
Engineering is considered a substitute for maintenance when mechanics are
unable to solve a problem.
True
False - (ANSWERS)False
PP&C controls maintenance by
Adjusting the plan and keeping checks on schedule
Creating long and short-term maintenance models for mechanics to follow
Planning routing, variable routine, and non-routine tasks
Writing technical publications for future planning - (ANSWERS)Adjusting
the plan and keeping checks on schedule
Planning and scheduling the appropriate manpower, parts and facilities are
examples of PP&C's _____ function.
Forecasting
Production
Planning
Controlling - (ANSWERS)Planning
PP&C is primarily responsible for
Scheduling daily, 48-hour, and transit checks
Ordering parts and estimating the amount of labor needed for unscheduled
, LGAV 3110 FINAL EXAM PREP 2026/2027 ACCURATE
QUESTIONS WITH CORRECT DETAILED ANSWERS || 100%
GUARANTEED PASS < RECENT VERSION >
maintenance
Planning and scheduling all aircraft maintenance activity within an airline
Providing feedback on completed maintenance jobs - (ANSWERS)Planning
and scheduling all aircraft maintenance activity within an airline
Schedules for checks and known modifications are finalized in which type
of forecast?
Long-term
Intermediate term
Short-Term
Extended-term - (ANSWERS)Short-Term
This PP&C function is considered an 'idealized' responsibility
Forecasting
Production
Planning
Controlling - (ANSWERS)Planning
Preliminary planning consists of
Implementing maintenance actions
Developing the maintenance program by engineering
Providing feedback from mechanics to PP&C for more accurate future
planning
Coordinating with flight operations and group handling -
(ANSWERS)Developing the maintenance program by engineering