100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

GENERAL CRANE SAFETY 2026| BRAND NEW ACTUAL EXAM WITH 100% VERIFIED QUESTIONS AND CORRECT SOLUTIONS| GUARANTEED VALUE PACK| ACE YOUR GRADES.

Puntuación
-
Vendido
-
Páginas
46
Grado
A+
Subido en
05-01-2026
Escrito en
2025/2026

GENERAL CRANE SAFETY 2026| BRAND NEW ACTUAL EXAM WITH 100% VERIFIED QUESTIONS AND CORRECT SOLUTIONS| GUARANTEED VALUE PACK| ACE YOUR GRADES.

Institución
GENERAL CRANE SAFETY
Grado
GENERAL CRANE SAFETY











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
GENERAL CRANE SAFETY
Grado
GENERAL CRANE SAFETY

Información del documento

Subido en
5 de enero de 2026
Número de páginas
46
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Page | 1

GENERAL CRANE SAFETY 2026| BRAND
NEW ACTUAL EXAM WITH 100% VERIFIED
QUESTIONS AND CORRECT SOLUTIONS|
GUARANTEED VALUE PACK| ACE YOUR
GRADES.

1. The crane operator's main concern during crane operation is-
A) Documentation
B) Operating safely
C) The weight of the load
D) Ground loading - correct answer - B) Operating safely




2. Which of the following formulas would be used to find the
volume of a rectangular or square shaped 3 dimensional
object?
A) Length × Width × Height
B) Length × Width x Area
C) Base × Height divided by 2
D) None of the above. - correct answer - A) Length × Width ×
Height




3. Which tag(s) alerts operators to special instructions for
operating the equipment?
A) Caution Tag

, Page | 2

B) Lockout Tag
C) Danger Tag
D) Out of Service Tag - correct answer - A) Caution Tag




4. When securing rough terrain cranes, the hydraulic extendable
boom should be in a near vertical position.
A) True
B) False - correct answer - incorrect
A) True




5. While the members of the crane team have defined
responsibilities, each have joint responsibilities as well. Each
member is responsible for all of the following except
A) Stop operations whenever safety is in question
B) Calculating the total load for each lift
C) Attend the pre-lift briefing
D) Keep non-essential personnel out of the operating area
E) Support the GOAL of safe crane operation - correct answer
- B) Calculating the total load for each lift




6. What is the crane communications hand signal pictured with
both arms extended, palms down, and the arms moving back
and forth horizontally?
A) Magnet is disconnected
B) Dog Everything

, Page | 3

C) Move slowly
D) Emergency stop
E) Bridge travel - correct answer - D) Emergency stop




7. What should be done when leaving a crane at the end of the
work shift?
A) Secure power
B) Set brakes, rotate locking devices and drum pawls
C) Raise blocks into the upper limit switch
D) Ensure all controls are in the neutral or "off"position
E) Ensure the power is on
F) Place the boom as close as possible to the vertical
position - correct answer - incorrect
B) B) D) F)




8. Select the proper method of landing a load.
A) Lower the load until it is a few inches off the ground and
stop
B) Lower the load slowly, stop a few inches from the landing
point, then slowly lower the rest of the way
C) Lower the load at full speed until the load contacts the
ground or landing surface
D) Lower the load slowly until it contacts the ground or landing
surface - correct answer - incorrect
E) Lower the load slowly until it contacts the ground or landing
surface

, Page | 4




9. Which of the following identifies the two categories of crane
lifts?
A) Critical and Common
B) Unusual and Routine
C) Complex and Non-Complex
D) Complex and Critical
E) Critical and Routine - correct answer - E) Critical and
Routine




10. Two-crane lifts require two signalmen to safely control the
load.
A) True
B) False - correct answer - A) True




11. What are the 5 principal parts of Category 1 and Category 4
cranes?
A) Boom perator's cab, carier frame, bridge girders, and
B) Operator's cab, bridge girders, wheels, motors, and trolley
C) Operator's cab, boom, wheels, motors, and drums
D) Boom, machinery house, rotate bearing, supporting
structure, and travel system - correct answer - D) Boom,
machinery house, rotate bearing, supporting structure, and
travel system
$18.29
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
YourBestAcademics Oxford University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
39
Miembro desde
11 meses
Número de seguidores
3
Documentos
5092
Última venta
2 días hace
A+ Your Best Academics

Thank you for visiting this page, here you will find all sort of documents, package deals and flashcards offered by Learn logic.

2.3

3 reseñas

5
1
4
0
3
0
2
0
1
2

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes