logo-home

Amazinggrace

Auf dieser Seite findest du alle Dokumente, Pakete-Deals und Übungsfragen, die der Verkäufer AmazingGrace anbietet.

Community

  • Anhänger
  • Folge ich

271 Deine Reviews

6221 Sachen

VA Contractors: General (Class A or B) Exam Questions & Answers

(0)
7,76 €
0x  verkauft

Which of the following estimating methods is typically used by the architect rather than the contractor? - Conceptual estimate An agreement that calls for a contractor to be paid actual costs for labor and materials plus a fixed fee for the contractor's overhead and profit is called a... - cost plus contract Equipment needs for a project are BEST estimated by... - Calculating the number of hours or days it is needed What type of insurance is needed for a partnership to insure that the bus...

i x
  •  Paket-Deal
  • Prüfung
  •  • 5 Seiten • 
  • von AmazingGrace • 
  • hochgeladen  03-04-2024
Schnellansicht
i x

Virginia Contractor's Exam (Class A or B) Practice and VA General (Class A or B) Practice

(0)
7,76 €
0x  verkauft

What is the MAXIMUM penalty for a contractor who undertakes work without the proper class of license? - $500 fine per day for each day of violation plus penalties for a misdemeanor. What is the PRIMARY purpose of licensing? - Protect the health and welfare of the public. The application for licensure MUST include - the business address of the proposed designated employee. All of the following must be licensed EXCEPT - a material supplier who advises a contractor. When a claimant is paid fu...

i x
  •  Paket-Deal
  • Prüfung
  •  • 7 Seiten • 
  • von AmazingGrace • 
  • hochgeladen  03-04-2024
Schnellansicht
i x

VA Contractor General Questions and Answers

(0)
7,76 €
0x  verkauft

A contractor does not notify a change of address and so does not receive a timely Notice of Renewal. Who is responsible for when the contractor does not renew his license on time? - The Licensee Contractor A Designated Employee should be? - At least 18, Full Time, Passed Required Exams What is the initial Recovery Fund fee? - $25.00 If a contractor ears more that $_______ per year, then the contractor is required to have a Class A. - $750,000.00 If a contract awards more than $_________ p...

i x
  •  Paket-Deal
  • Prüfung
  •  • 7 Seiten • 
  • von AmazingGrace • 
  • hochgeladen  03-04-2024
Schnellansicht
i x

Virginia Contractors License Exam Questions & Answers 2024

(0)
11,15 €
0x  verkauft

What is the minimum distance from exposed ground for a wood framing member that is in contact with?? - 24 inches What is the maximum allowed slope for the top surface of a footing? - None Where should a drip edge be used? - Beneath the underlayment What is the minimum height for guard rails for balcony? - 36 inches What test is performed to determine the drainage capacity of a soil? - Perculation test- Perc Test What is the minimum width of footings used for a one story structure build on ...

i x
  •  Paket-Deal
  • Prüfung
  •  • 12 Seiten • 
  • von AmazingGrace • 
  • hochgeladen  03-04-2024
Schnellansicht
i x

NASLCA Virginia Exam Practice | Answered Correctly | Latest Version 2024

(0)
12,13 €
0x  verkauft

What is the MAXIMUM penalty for a contractor who undertakes work without the proper class of license? - $500 fine per day for each day of violation plus penalties for a misdemeanor. All Class A contractor licensure applications MUST include - information on the knowledge, skills, and abilities of the applicant. What is the PRIMARY purpose of licensing? - Protect the health and welfare of the public. When a claimant is paid funds from the Contractors Recovery Trust Fund - the contractor's l...

i x
  •  Paket-Deal
  • Prüfung
  •  • 17 Seiten • 
  • von AmazingGrace • 
  • hochgeladen  03-04-2024
Schnellansicht
i x

Contractors License VA PART 2024 Questions & Answers (Verified)

(0)
8,24 €
0x  verkauft

A contractor does not notify a change of address and so does not receive a timely Notice of Renewal. Who is responsible when the contractor does not renew his license on time? a) USBC b)OSHA c)The licensee Contractor d)DPOR - The licensee Contractor A designated employee should be? a)any full time worker b) at least 18 years old, full time employee, has passed required examination c) at least 18 years old and 5 years experienced for Class A d) the owner - at least 18 years old, full ti...

i x
  •  Paket-Deal
  • Prüfung
  •  • 8 Seiten • 
  • von AmazingGrace • 
  • hochgeladen  03-04-2024
Schnellansicht
i x

VA Contractors: VA Advanced (Class A) 2024 Questions with 100% Correct Answers

(0)
7,76 €
0x  verkauft

A lump sum contract on a project has a total contract price of $160,000. Retainage has been held back at 10%. The contractor has received progress payments for 75% of the project. The contractor submits a request for final payment for the new completed project. The final payment amount should be for... - More than $50,000 What is the total value of current assets for an accrual basis company that has the following? Checking account cash balance is $4,800; materials inventory for work-in-pro...

i x
  •  Paket-Deal
  • Prüfung
  •  • 4 Seiten • 
  • von AmazingGrace • 
  • hochgeladen  03-04-2024
Schnellansicht
i x

Virginia Contractor's License Quiz 2 | 100% Correct Answers

(0)
7,76 €
0x  verkauft

What is a bid? - A guarantee to construct the project in accordance with the bid documents for a quoted price Employees who are fired for filing an OSHA complaint have ______ to notify OSHA. - 30 days To obtain the best price for materials you should obtain at least how many bids? - 3 Getting too many bids is a waste of time, but getting too few bids makes it difficult to determine whether you are getting a good deal Which costs should ALWAYS be included in the estimate? - Contingency fee ...

i x
  •  Paket-Deal
  • Prüfung
  •  • 6 Seiten • 
  • von AmazingGrace • 
  • hochgeladen  03-04-2024
Schnellansicht
i x

WV BUSINESS LAW PRACTICE EXAM FOR CONTRACTORS 2024 | Verified

(0)
8,24 €
0x  verkauft

1. What type of contract requires the contractor to be responsible for both the engineering and construction of a project? a. Traditional b. Design build c. Turn key d. Concession - b. Design build 2. By what date is an employer required to provide its employees with a W-2? a. January 31 b. February 15 c. March 31 d. April 15 - a. January 31 3. When developing a project schedule, what does WBS stand for? a. Work breakdown structure b. Work building schedule c. Wall board system d....

i x
  • Prüfung
  •  • 9 Seiten • 
  • von AmazingGrace • 
  • hochgeladen  03-04-2024
Schnellansicht
i x